Stacker-reclaimer Rail Re-levelled
Following unusually heavy rainfall, subsidence had become evident. The rail had subsided and deflected beyond safe tolerances during the operation of the stacker reclaimer. In 15 days Teretek® Deep-Injection and Teretek® Slab- Lifting had the rail re-levelled and fully re-supported.