Operating for 35 Years I 150+ Years of Experience I 84,000+ Jobs Completed I Iso Accredited I In-house Engineering

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

Hidden
This field is for validation purposes and should be left unchanged.

Project Profile W 7048

Taxiways Re-supported At Perth Airport

Sub-industry
Airports
Problems
Out-of-level Concrete
Location
WA
Year
2007
Solutions
Slab Lifting
Technology
Uretek®

The problem

The West Australian Airports Corporation, had a problem with the taxiway slabs at Gates 13 & 14 of Perth Domestic Airport. These two gates are the only ones that service 747 aircraft. The slabs in these taxiway areas were pumping and cracking under the load of the aircraft when travelling at their slowest in this area as they come to a stop at the gates. In five nights the team was able to completely re-support all the slabs and ensure that they were made precisely level. This was achieved without interruption to scheduled airport operations.

The solution

To compact the sub-base ground and re-level the slabs to rehabilitate the taxiways at Gates 13 and 14 for 747s at the airport. The problem location involved an area of approx. 2,000m2 and 900 lineal metres of joints. The slabs were 350mm thick, doweled and keyed. Poor joint seals had been allowing water ingress beneath the slabs. The construction had not been designed for today’s loads.

The Result

In just five nights, much less time than the removal and replacement of the concrete slabs and at far less cost, the taxiway slabs were given greatly increased support to allow 747 usages well into the future. Removal and replacement would have entailed huge disruption to airport operations and significant interruption to flight traffic over a lengthy period, apart from entailing much greater expense. The proposed solution was quick, economical and caused no interruption to airport operations. It saved a huge amount of time, money and disruption.

Resources

Project Resources & Downloads

Taxiways Re-supported At Perth Airport
Teretek®
Next Project

Rock Weir Consolidation

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Residential

Commercial

Infrastructure

Mining

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram