Operating for 35 Years I 150+ Years of Experience I 84,000+ Jobs Completed I Iso Accredited I In-house Engineering

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

Hidden
This field is for validation purposes and should be left unchanged.

Project Profile N5295

Rock Weir Consolidation

Sub-industry
Ports
Problems
Void Filling
Location
NSW
Year
2007
Solutions
Void Filling
Technology
Permeation Grouting

The problem

Uretek grout was used to fill and seal breaches in a dam structure and downstream in the rip-rap area to conglomerate the structure into a single impervious stable mass. This work was done to assist the local Shire Council’s water management and conservation strategy.

The solution

The objective was to stop the enormous volume of water loss from the weir in this very dry part of the country.

The Result

Located within the heart of rural New South Wales, the Condoblin rock weir assists in the Lachlan Shire Council’s local water management strategy.

The issue confronting the Council engineers was that the weir had exceeded its original design life, and consequently the concrete and timber-plank-faced dam wall below the water level was failing. This was allowing the water to penetrate the wall and threatened to wash away the supporting rock retaining structure, resulting in total weir failure.

The weir was estimated to be losing water volume far in excess of design flow, 25 megalitres (equivalent to 25 Olympic swimming pools) daily.

For this project, an environmentally inert, engineered structural resin was selected. The grout was injected from above, under difficult conditions, into the body of the supporting rock retaining structure, behind the dam face.

The grout successfully filled and sealed the breaches in the dam structure, stopping the flow of water below the waterline. Injection was then repeated into the adjacent supporting rock structure, a metre or two downstream of the dam wall.

The engineered structural resins consolidated and strengthened the wall and rock structure into a single and impervious mass.

The engineered structural resins consolidated and strengthened the wall and rock structure into a single and impervious mass.

Resources

Project Resources & Downloads

Rock Weir Consolidation
Permeation Grouting
Next Project

Rail Bridge Strengthened and Re-Supported

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Residential

Commercial

Infrastructure

Mining

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram