Operating for 36 Years I 150+ Years of Experience I 87,000+ Jobs Completed I Iso Accredited I In-house Engineers

Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using our online form and include a brief message about the issues you are experiencing. A Mainmark expert will contact you within the next 24 to 48 hours, excluding weekends and public holidays.

Hidden
Consent
This field is for validation purposes and should be left unchanged.

Project Profile Q17N001

Mainmark rectifies un-level service tunnels at WICET

Sub-industry
Mining
Problems
Subsidence
Location
QLD
Year
2016
Solutions
Re-levelling
Technology
Teretek®

The problem

The Wiggins Island Coal Export Terminal (WICET) was experiencing weak ground under some of its critical service tunnels. The tunnels, which were approximately 2.6m in diameter, were made up of a number of pre-cast sections and were at risk of subsidence due to the weak ground conditions.

As part of the broader project schedule, WICET contracted John Holland to undertake proactive rectification works. Mainmark was sub-contracted by John Holland to improve ground compaction under the tunnels.

Site access was limited, with just 1676mm in width and 1942mm in height available for Mainmark to establish equipment in order for the project to be completed.

The Mainmark team customised a transportable rig that was small enough to fit in the confined space and facilitate the application of Mainmark’s proprietary structural resin solution, without compromising the delivery mechanism or the end result.

Once the customised rig was finalised, Mainmark was able to access the site and successfully strengthen the ground beneath the tunnels.

The solution

To preserve the integrity of the tunnels and support future operations, Mainmark needed to achieve improved ground compaction under the tunnels to limit any potential settlement.

If the tunnels had failed, the concrete sections may have had to be removed via excavation. This costly and time-consuming event needed to be avoided due to the operational and safety requirements of the Terminal.

Due to the small size of the tunnels, Mainmark needed to be able to transport all material and equipment into the tunnel via an access space of just 1676mm wide and 1942mm high.

The Result

Mainmark recommended a unique structural resin solution, which is ideally suited for improving ground bearing capacity and re-supporting and re-levelling structures. The precise and controlled application of this solution would bring the service tunnels back into alignment with the main tunnels.

Mainmark injected the structural resin beneath the tunnels in sections to fill voids and increase ground support. Throughout the process laser levelling equipment was used to monitor the lift to realign the tunnel with the main tunnels. The ground strength was measured to ensure it would withstand heavy loads into the future.

Mainmark addressed the small access space by custom-making a rig in its workshop. The rig complied with the site’s rigorous safety standards and, crucially, still allowed Mainmark’s technicians to apply the structural resin solution according to specifications for a predictable, successful outcome.

As it was not possible to run a generator in the underground worksite due to potentially harmful emissions, developing the solution included calculating how far away from the worksite the compressed air could be while still maintaining pressure. Once the equipment was in the tunnel, the project proceeded without interruption.

The project was completed by Mainmark with no downtime and no excavation.

“In conjunction with John Holland, Mainmark was a cornerstone to the success of the tunnel injection solution,” said John Holland Group senior project engineer, Cameron Pahor. “Mainmark was able to provide a resolution to several challenges to deliver a successful project from design to construction, for us and our client, in tough operating conditions.”

Project Resources & Downloads

Project Profile
Next Project

Rail Tunnel Safely Decommissioned

Mainmark

© 2025 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Solutions

Ground Improvement

Subsidence Repair

Re-Levelling

Void Filling

Slab Lifting

Crack Wall Repair

Sinking Floors

Sinking Foundation Repair

Underpinning Repairs

Locations

Adelaide

Brisbane

Canberra

Hobart

Melbourne

New South Wales

Perth

Queensland

South Australia

Sydney

Tasmania

Townsville

Victoria

Western Australia

Sectors

Commercial

Residential

Infrastructure

Mining

Technologies

Teretek®

Terefil®

JOG

About Us

Our team

Careers

Media & Press

News

Awards

Contact

Locations
Mainmark Sydney

169 Sailors Bay Rd, Northbridge NSW 2063

 

Mainmark Melbourne

Unit 8, 33 Rosalie Street, Springvale VIC 3171

Mainmark South Australia

19 Heath St, Lonsdale SA 5160

Mainmark Queensland

20 Computer Road, Yatala QLD 4207

Mainmark Perth

115 Excellence Dr, Wangara WA 6065

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram