Operating for 35 Years I 150+ Years of Experience I 84,000+ Jobs Completed I Iso Accredited I In-house Engineering

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

Hidden
This field is for validation purposes and should be left unchanged.

Project Profile N17A099

Mainmark Develops Bespoke Solution to Stabilise Underground Mine Crusher

Sub-industry
Mining
Problems
Subsidence
Location
NSW
Year
2017
Solutions
Ground Improvement
Technology
Teretek®

The problem

At a mine site in far west New South Wales, Mainmark was contracted to stabilise mine crushing equipment situated in a confined area 875m below the surface of the mine.

The cast iron crusher, manufactured and installed in the 1950s, was positioned on a metal baseplate and encased in a secondary support structure above concrete footings. The machine processes bulk excavated minerals below the ground into smaller more manageable pieces, which are then conveyed to the surface for further processing. Over the course of its operation, the crusher had developed a rocking motion, with the whole base and secondary support structure lifting up and down when in use. It was feared that the movement would eventually break the crusher.

Mainmark worked closely with a team of resin supply specialists to formulate a customised product solution and application methodology to provide the necessary stabilisation and support. A combination of grout systems including dry pack materials and resin injection was utilised to address stability around the support structure and baseplate. The project required treatment equipment and materials to be positioned within accessible range of the crusher location, and for works to be completed within a limited shutdown period at the mine.

Mainmark’s specialist grout solution was efficiently and successfully applied, eliminating the rocking motion of the crusher to reduce the possibility of damage or equipment failure over time.

The solution

The objective of the project was to stabilise the crusher by providing the necessary support between the steel baseplate and surrounding concrete structure. The solution needed to be installed within the pit area, located 875m below ground, under a heavy piece of equipment. All the work had to be completed in a short timeframe to minimise the shutdown period.

Technically, the solution required products of suitable strength, with short cure times, that could find their level in a confined access environment. Additionally, the specified products needed to be unaffected by the oil bath surrounding the crusher.

The Result

Mainmark partnered with Building Chemical Supplies (BCS), to formulate a bespoke solution that would deliver the required high-strength bearing capacity between the crusher’s baseplate, the secondary support structure, and footings.

As the primary contractor, Mainmark consulted closely with the client and visited the site to carry out a full assessment. Mainmark partnered with Building Chemical Supplies (BCS), to formulate a bespoke solution that would deliver the required high-strength bearing capacity between the crusher’s baseplate, the secondary support structure, and footings.

High-pressure water and detergent systems were used to prepare the surfaces and remove the oil bath surrounding the crusher, ahead of the placement of the chosen grout systems. The crusher was also stripped down to enable access to the treatment area.

A combination of pack grout and resin injection was used to remediate the site. High-strength dry pack non-shrink grout was placed around the perimeter of the base and under the secondary support structure to an area of 5.2m2. Then, high-strength resin application via packers drilled to the perimeter of the steel baseplate addressed an area approximately 9.3m2 under the crusher base and the pit belowSeveral concrete fractures caused by unsuccessful, historical attempts to remove the crusher’s anchor bolts were also sealed and re-bonded.The work was completed within a one week period, minimising the mine’s shutdown time. The client reported the rocking motion had ceased, describing the outcome achieved as a ‘top job’ that they wished they had undertaken sooner.

 

Resources

Project Resources & Downloads

Mainmark Develops Bespoke Solution to Stabilise Underground Mine Crusher
Teretek®
Next Project

Sonic Drilling and Teretek® Used to Address Rail Line Settlement at Wiggins Island Coal Export Terminal

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Residential

Commercial

Infrastructure

Mining

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram