Operating for 35 Years I 150+ Years of Experience I 84,000+ Jobs Completed I Iso Accredited I In-house Engineering

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

Hidden
This field is for validation purposes and should be left unchanged.

Project Profile P14U116

ROM Bridge Embankment Rehabilitated

Sub-industry
Mining
Problems
Subsidence
Location
QLD
Year
2014
Solutions
Other
Technology
Other

The problem

Mainmark carried out a complete rehabilitation of the ROM bridge embankments at a coal mine-site.

With the mine operations closed for 30 days, Mainmark cleared vegetation and injected an expanding resin in a grid pattern, into the voids, between the existing veneer of shot-crete embankment lining and the soil embankment below.

Mainmark installed a resin injected anchor system, installed re-enforcing mesh and then applied fibre strand impregnated shot-crete to damaged areas of the embankment faces.

The solution

To re-instate the integrity of the ROM bridge embankment and to mitigate the effects of weather and the extremely heavy loads carried by the bridge.

The Result

1. Mainmark cleared all vegetation from the existing shotcrete area of the four ROM bridge slopes using specialised saws and elevated work platforms (EWP).

2. Structural grade expanding resin was injected through a grid pattern of drilled holes to fill voids between the existing veneer of shot-crete lining and the soil embankment below. This increased the connection between the slab and the lining and provided mitigation of hydraulic weathering and erosion of the sub-grade and improved the uniformity of support between the lining and soil.

3. An anchor system was installed in each of the four embankments. 5-metre-deep hollow drill rods were used and resin-grout filled which created the anchor points.The 10 anchors in each embankment were secured with 300mm x 300mm steel face-plates.

4. Re-enforcing mesh was installed in the cracked and weathered areas of the existing shot-creted embankment linings and re-enforcement bars were driven in 1000mm deep. 600mm wide re-enforcing mesh was applied to the trailing edges of all four shot-crete linings and a connecting edge was installed from the top of the slope to the ROM abutment slab, to provide drainage away from the area.

5. Fibre strand impregnated shotcrete was installed to the damaged areas of the faces of the existing shotcrete linings, including the trailing and top edges, to improve water shedding.

A geofabric and rock-filled drain was installed across the roadways from each of the four embankments. 40 weep holes were installed in the embankment face, using 50mm to 75mm PVC inserts grouted into place.Establishment and dis-establishment each took a day and the actual operations were completed over a 21- day period.

The integrity of the four embankment slopes was fully restored with measures taken to mitigate future erosion, degradation and eliminate the ‘failing object” risk that the site faced due to the slippage of the shotcrete.

Resources

Project Resources & Downloads

ROM Bridge Embankment Rehabilitated
Next Project

Stacker Crane Rail Re-levelled

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Residential

Commercial

Infrastructure

Mining

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram