Operating for 35 Years I 150+ Years of Experience I 84,000+ Jobs Completed I Iso Accredited I In-house Engineering

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

Hidden
This field is for validation purposes and should be left unchanged.

Project Profile N21AR193

Teretek® Used to Repair Damaged Nature Reserve Causeway

Sub-industry
Culverts
Problems
Erosion
Location
ACT
Year
2022
Solutions
Void Filling
Technology
Teretek®

The problem

In early 2021, a causeway located across Mountain Creek in ACT’s idyllic Tidbinbilla Nature Reserve suffered serious damage during a series of torrential downpours.

The causeway features three 12m long concrete reinforced culverts, each measuring 750mm in diameter, situated beneath the road and within an embankment.

The embankment consisted of compacted bedding material and backfill, with an ageing bluestone protection wall supporting the culvert pipes. The bluestone wall was significantly compromised in multiple places due to the force of the creek’s water flow, which became a raging torrent during rain events. Prior to the heavy rainfall, the reserve was exposed to bushfires which had destroyed vital areas of protective vegetation.

This allowed the creek’s fast flowing water to breach the bluestone wall in a number of places and washed away large amounts of soil fines from the embankment, creating several voids in the protective wall and erosion beneath the causeway.

Worried about the ongoing stability of the road and culverts, the ACT Parks and Conservation Service commissioned a ground penetrating radar (GPR) test to assess the damage and severity of the voiding beneath the roadway. While the road was determined to be structurally adequate for general vehicle use, the load limit had been compromised, preventing trucks and tourist buses from accessing the road.

To arrest the damage, ground improvement works were required to stabilise the embankment and re-support the ground beneath the road, while also protecting the long-term performance and durability of the culverts.

As the nature reserve was located in an environmentally sensitive area, replacing the existing culverts was quickly ruled out. Instead, Mainmark was commissioned to

provide an environmentally safe, non-intrusive and cost-effective remediation solution.

The solution

Mainmark was required to deliver a ground improvement solution by filling voids, strengthening the weakened backfill within the embankment and re-supporting the surrounding culverts and concrete roadway so the bluestone protection wall could be repaired.

The solution also needed to provide long- term protection against further erosion and prevent water infiltration into the bedding and embankment to enable the road to reopen for tourist buses and trucks

The Result

Mainmark’s Teretek® engineered resin was used as an ideal remediation solution due to the product’s ability to increase ground bearing capacity without damaging the already compromised culverts.

Teretek is environmentally inert and therefore has no detrimental effects on ground water, soil quality or local wildlife. It is also backed by a 50-year product warranty.

Prior to commencing the project, a leak barrier was constructed between the work zone and the creek to ensure the safety and protection of the surrounding area.

Once the area was fully contained, Mainmark commenced the Teretek resin injection treatment. Approximately 500kg of Teretek engineered resin was injected into the ground through very small tubes, in a process likened to keyhole surgery. Technicians targeted areas where weak soil and voids had been identified in the ground penetrating radar (GPR) report. The project immediately re-established ground support to the embankment and concrete roadway.

Teretek proved to be an extremely cost-effective and environmentally safe alternative to replacing the culverts, which would have required road closure and expensive excavation works.

The entire project was successfully completed within two days, after which the road was immediately re-opened to traffic including heavy vehicles.

Resources

Project Resources & Downloads

Teretek® Used To Repair Damaged Nature Reserve Causeway
Teretek®
Next Project

Teretek® Protects Waterfront Businesses By Remediating Bunbury Seawall

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Residential

Commercial

Infrastructure

Mining

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram