Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile N Benefil 2004

    Sea Wall Void Filled and Sealed

    Sub-industry
    Seawalls
    Problems
    Void Filling
    Location
    NSW
    Year
    2004
    Solutions
    Void Filling
    Technology
    Terefil®

    The problem

    Erosion behind the sandstone sea wall at Pulpit Point on Sydney Harbour caused by tidal action was remediated using Benefil light-weight engineering filler grout. That was judged to be the most environmentally sustainable and the most cost-effective solution to the problem.

    The solution

    The problem for the Hunter’s Hill Council engineers was how to best grout behind the sandstone sea wall at Pulpit Point to compensate for the erosion by tidal action and to minimise the risk polluting the harbour.

    The main objectives were:
    • to fill the large inter-connected voids behind the sea wall.
    • to seal the joints between the eroded sandstone blocks.
    • to minimise the ingress of sea water washing out soil behind the sea wall, while allowing land water to drain slowly into the harbour.

    The Result

    The Chief Council Engineer, having assessed many Sea Wall Void Filled and Sealed N Benefil 2004 and various alternative proposals, selected Benefil, one of our unique proprietary engineered resins as the most sustainable, environmentally inert and cost effective solution to repair the sea wall.

    The section to be grouted was 40m long by 4m wide. The depth varied, with the volume o f voids estimated to be about 40m3 . Extremely light in weight, Benefil was easily pumped the 60m from the Operations rig where it was mixed.

    The Benefil was injected from above via 19 tubes spaced at 2m intervals to go down into the large interconnected voids behind the sea wall. A light-weight, closed cell foam, Benefil readily floats. So foam emerging through the joints in the block-work was contained behind floating booms for easy cleanup. As it is environmentally inert, it poses no risk of contaminating waterways. Its emergence through the joints was proof that the voids were indeed sealed.

    The Benefil method was effective in providing a barrier to future erosion of the soil from behind the sea wall and to the potential destruction of the wall itself. It successfully filled all the voids and sealed the joints between the eroded sandstone blocks minimising the future ingress of sea water. The porous Benefil resin provided a route for the slow escape of rainwater from the land but offered sufficient resistance to the scouring tidal action.

    Resources

    Project Resources & Downloads

    Terefil®
    Next Project

    Wartime Explosives Magazine Re-supported

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    Level 7/124 Walker Street, North Sydney NSW 2060

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram