Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile N15Q036

    Power Station Floor Re-supported

    Sub-industry
    Utilities
    Problems
    Subsidence
    Location
    QLD
    Year
    2015
    Solutions
    Ground Improvement
    Technology
    Uretek®

    The problem

    A mains pipe had ruptured 3m under the concrete floor of the Bayswater #2 Power Station, causing cracks to open up and fines to be washed away from the cooling water circulation system under the floor slabs.Far North Queensland coast needed to be restored.

    A lack of floor support had been created, preventing the entry of the 60 tonne cranes required for the power station’s routine maintenance program. Mainmark rectified the situation quickly and economically with Uretek Deep-Injection of expanding structural resins to fill voids and compact the subbase, consolidating the area and under-sealing the floor.

    The solution

    The objectives were to investigate the extent of the problem, to consolidate the foundation ground and to reconfirm full support of the concrete floor without raising it.

    The Result

    Boroscope inspections through the holes revealed a large amount of fill material had been washed out.

    To establish the extent of the washout, 16mm Ø holes were drilled through the 200mm thick reinforced concrete floor on a 2.5m to 3.5m grid across an area of 25m by 35m, where extruded fines/sand was visually observed and where ground penetrating radar scans indicated voids.

    Boroscope inspections through the holes revealed a large amount of fill material had been washed out. Substantial cracks had opened up both between cooling water circulation channel inspection pits and the underside of the floor. Uretek Deep-Injection of expanding structural resin was carried out across the affected area via tubes through the concrete floor at 2m to 3m centres. Injection was continued until full re-support of all sections of the floor was confirmed and until resin was observed to have sealed all cracks that had opened in the cooling water system inspection pits.

    There was no excavation, little noise, no water and no mess created by this process. Minimal additional weight was added to the foundation ground. The material used is impermeable, is not brittle and will not break up. There was no interruption to the work of the power station and vehicles were able to drive over the area just 30 minutes after the Mainmark work was completed. Without interruption to the operations of the power station, the reinforced concrete floor was fully resupported and under-sealed against further erosion. The restoration of floor bearing capacity enabled resumption of the heavy crane traffic required for the power station’s regular maintenance program.

    Resources

    Project Resources & Downloads

    Power Station Floor Re Supported
    Next Project

    Jack-Assisted Driveway Slab Remediation

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram