At the Downer EDI Rail facility in Port Augusta, South Australia, locomotives are overhauled and re-fitted. Prior to entering the workshop area they are washed down over a concrete slab area. As so often happens with vehicle wash-down areas, a subsidence problem had occurred caused by the ingress of water eroding the sub-base of the slabs. The slabs had subsided preventing the water from running off into the drains between the rails. Taking great care keep the rails precisely level and aligned, our team from Adelaide were able to re-support the slabs and recreate proper drainage of the area in just one full day.
The solution
The objective was to re-support the slabs and to realign them so that the water used to wash locomotives would run into the mid-rail drains, and to achieve this while maintaining the rails in their precise positions.
The Result
Uretek Deep-Injection: We re-supported the area by injecting engineered structural resin directly through the slabs down to the weaker layers to a depth of 1,000 – 1,500mm. Uretek Slab-Lifting: By injecting directly underneath wooden sleepers and below the ballast, we raised the exact sections of slab required to correct the drainage of the wash down area.
The wash-down slabs were re-supported and raised to correct levels, restoring drainage without disturbing the rail alignment.
Resources
Project Resources & Downloads
Locomotive Wash-down Area Re-aligned
Teretek®
Download file
Please fill out this form to access this file.Next Project
Voids Filled Beneath Railway Platform
© 2025 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.
Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503