Project Profile S10W046

Locomotive Wash-down Area Re-aligned

Sub-industry
Problems
Slab Lifting
Location
WA
Year
2009
Solutions
Re-levelling
Technology
Uretek®

The problem

At the Downer EDI Rail facility in Port Augusta, South Australia, locomotives are overhauled and re-fitted. Prior to entering the workshop area they are washed down over a concrete slab area. As so often happens with vehicle wash-down areas, a subsidence problem had occurred caused by the ingress of water eroding the sub-base of the slabs. The slabs had subsided preventing the water from running off into the drains between the rails. Taking great care keep the rails precisely level and aligned, our team from Adelaide were able to re-support the slabs and recreate proper drainage of the area in just one full day.

The solution

The objective was to re-support the slabs and to realign them so that the water used to wash locomotives would run into the mid-rail drains, and to achieve this while maintaining the rails in their precise positions.

The Result

Uretek Deep-Injection: We re-supported the area by injecting engineered structural resin directly through the slabs down to the weaker layers to a depth of 1,000 – 1,500mm. Uretek Slab-Lifting: By injecting directly underneath wooden sleepers and below the ballast, we raised the exact sections of slab required to correct the drainage of the wash down area.

The wash-down slabs were re-supported and raised to correct levels, restoring drainage without disturbing the rail alignment.

Resources

Project Resources & Downloads

Locomotive Wash-down Area Re-aligned
Teretek®
Next Project

Voids Filled Beneath Railway Platform

© 2023 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

Residential

Commercial

Infrastructure

Mining

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex