Project Profile N8056

Voids Filled Beneath Railway Platform

Sub-industry
Rail
Problems
Subsidence
Location
NSW
Year
2007
Solutions
Void Filling
Technology
Uretek®

The problem

Originally built on non-cohesive fill, Platform #2 at Central Railway Station, Sydney, had developed significant voiding in the foundation ground. Void-filling and re-support of the platform was achieved by Mainmark using Uretek Deep-Injection with expanding structural resins. The project was carried out in just 3.5 hours in the middle of the night, thus minimising interference with station activities. Use of very small diameter injection tubes preserved the the tiled surface of the platform.

The solution

The objective was to fill the voids completely and densify the foundation ground to re-support the structure quickly and with minimal inconvenience to station services.

The Result

Voids of between 20mm and 70mm were discovered in the foundation ground over an area of approximately 20m2 . Uretek Deep-Injection points were established across the area, centering on the void locations. Voids Filled Beneath Railway Platform N8056 In order to minimise the possibilty of damage to the tiled surface of the platform, holes of just 6mm Ø were drilled.

Injection tubes were inserted in these holes and Deep-Injections were made across each part of the area in rotation. At each point injection was continued until the platform showed a minimal lift of between 1mm and 3mm. This established that every section of the platform area had been completely re-supported with the foundation ground bearing the mass of the platform above.

The voiding was completely eliminated and re-support of the platform was confirmed. The program was carried out in one night, between 9:30pm and 1am by a two-man technical team, causing minimal disturbance to station activities and almost imperceptible effect on the tiled surface of the platform.

Resources

Project Resources & Downloads

Voids Filled Beneath Railway Platform
Teretek®
Next Project

Taxiways Re-supported At Perth Airport

© 2023 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

Residential

Commercial

Infrastructure

Mining

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex