Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile S10W046

    Locomotive Wash-down Area Re-aligned

    Sub-industry
    Problems
    Slab Lifting
    Location
    WA
    Year
    2009
    Solutions
    Re-levelling
    Technology
    Uretek®

    The problem

    At the Downer EDI Rail facility in Port Augusta, South Australia, locomotives are overhauled and re-fitted. Prior to entering the workshop area they are washed down over a concrete slab area. As so often happens with vehicle wash-down areas, a subsidence problem had occurred caused by the ingress of water eroding the sub-base of the slabs. The slabs had subsided preventing the water from running off into the drains between the rails. Taking great care keep the rails precisely level and aligned, our team from Adelaide were able to re-support the slabs and recreate proper drainage of the area in just one full day.

    The solution

    The objective was to re-support the slabs and to realign them so that the water used to wash locomotives would run into the mid-rail drains, and to achieve this while maintaining the rails in their precise positions.

    The Result

    Uretek Deep-Injection: We re-supported the area by injecting engineered structural resin directly through the slabs down to the weaker layers to a depth of 1,000 – 1,500mm. Uretek Slab-Lifting: By injecting directly underneath wooden sleepers and below the ballast, we raised the exact sections of slab required to correct the drainage of the wash down area.

    The wash-down slabs were re-supported and raised to correct levels, restoring drainage without disturbing the rail alignment.

    Resources

    Project Resources & Downloads

    Locomotive Wash-down Area Re-aligned
    Teretek®
    Next Project

    Voids Filled Beneath Railway Platform

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram