Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Q23P075

    Re-Supporting a Subsiding Reservoir with Targeted Resin Injection

    Sub-industry
    Utilities
    Problems
    Voiding Beneath Floor Slabs
    Location
    QLD
    Year
    2025
    Solutions
    Ground Improvement
    Technology
    Teretek®

    Problem

    A concrete reservoir was experiencing significant voiding and uneven settlement beneath its ring beam and floor slab. Mainmark delivered a targeted resin injection solution to fill the voids, re-establish ground contact, and stabilise the foundation without excavation or interrupting operations.

    A concrete water reservoir, supported by a ring beam foundation and concrete floor slab, began exhibiting uneven settlement across its perimeter. Approximately 30% of the ring beam had subsided by up to 50 mm due to significant voiding beneath the foundation. Ongoing erosion and natural ground settlement had created cavities under sections of the structure, resulting in loss of ground contact and uneven bearing support. This differential movement posed a risk to the reservoir’s structural integrity and long-term serviceability. The council required a fast, non-invasive remediation method to re-establish uniform foundation support without excavation or prolonged interruption to reservoir operations.

    Solution

    Mainmark proposed a targeted polyurethane resin injection solution to fill the voids and re-support both the affected sections of the ring beam and the internal floor slab.

    The works involved incremental injection beneath the ring beam to depths of up to 2,500 mm below ground level (BGL), allowing the expanding structural resin to penetrate and densify multiple soil layers. This process reinstated contact between the ring beam, floor slab, and subgrade while compacting and stabilising the underlying soil matrix. The internal slab was similarly treated using controlled resin injection to restore uniform support and eliminate voiding beneath the floor area. All works were performed using small-diameter injection points, enabling precise control of lift and ground improvement while maintaining reservoir operation throughout. The process was completed without excavation, noise, or contamination risk, meeting the council’s operational and environmental requirements.

    Result

    The incremental injection program successfully restored full bearing support beneath the affected 30% of the ring beam and supporting the internal floor slab, eliminating voids and reinstating uniform support across the structure.

    Post-treatment monitoring confirmed effective ground densification, stable load transfer, and improved foundation integrity.

    The works were completed efficiently, safely, and without operational downtime, delivering a durable, non-disruptive, and cost-effective solution that safeguarded the reservoir’s long-term performance.

     

    Resources

    Project Resources & Downloads

    Re-Supporting a Subsiding Reservoir with Targeted Resin Injection
    Need help?

    Need help with a project? Contact us today.

    Next Project

    Underfloor Void Fill at a Central Australia Resort

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram