Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile T18E001

    Teretek® Fills Underwater Voids to Stabilise Kimberley Rail Bridge Piers Following Floods

    Sub-industry
    Bridge
    Problems
    Subsidence
    Location
    ACT
    Year
    2019
    Solutions
    Void Filling
    Technology
    Teretek®

    The problem

    The heritage listed Kimberley Rail Bridge is a vital part of Tasmania’s Burnie to Hobart Rail Freight Corridor. Originally built in 1884 and then extended in 1976, the bridge stretches 76m over the Mersey River and is one of three remaining wrought iron structures still in use in the Tasmanian rail network.

    During the devastating floods in 2016, one of four Kimberley Rail Bridge spans collapsed as a result of scour (erosion in the riverbed) affecting the western abutment. This left the rail line between Burnie and Brighton impassable, impacting the State’s freight transportation.

    Urgent works were undertaken to rebuild the collapsed western-most span and abutment with modern materials, creating a new superstructure made of steel, supplementing the original wrought iron spans.

    Once the rail line resumed operation, TasRail identified further scour under the edges of two of the mass concrete piers supporting the bridge. The two piers form part of the original bridge construction and consist of 3m wide and 8m long mass concrete columns that are founded in the river bed, with an elevation of 7.7m-8.6m above the riverbed.

    To determine the extent of scour a carefully coordinated inspection was led by engineering consultants Pitt & Sherry, using a team of divers and a 3D sonar survey. It was determined that the riverbed had scoured away around some edges of the piers exposing the underside of the pier footing.

    Numerous remediation approaches were considered, including installing concrete sheet piles which would require temporary damming of the river and excavating, or the more extreme measure of decommissioning the bridge entirely and rebuilding it.

    The solution chosen involved placing pea gravel aggregate in the larger scour areas and surrounding the exterior of the pier footing with a combination of large and small geofabric sand bags to contain the pea gravel and prevent the aggregate from being washed out by the river flow.

    Based on prior experience, Pitt & Sherry recommended that Mainmark’s proprietary Teretek® resin injection solution be used to bind the aggregate and reduce the voiding, to increase the longevity of the scour resistance protecting the bridge piers. Mainmark was contracted to complete remediation works under project managers, VEC Civil Engineering.

    The solution

    The key objective was to restore long-term stability of the Kimberley Rail Bridge piers, by remediating all areas that had been undermined by scour to the piers and to protect each bridge pier from any further scour.

    Mainmark was required to inject Teretek resin into the aggregate to fill 8 underground voids surrounding the bridge piers and to restore structural integrity without impacting the Mersey River.

    The Result

    Prior to injecting Teretek, dive teams needed to clear underwater vegetation, place the aggregate into the voids and insert one 50mm galvanised water pipe into the centre of each void to allow Mainmark technicians to guide the resin injection tubes directly into the treatment area.

    The injection process involved meticulous planning, with site access extremely limited due to the flowing river and proximity to an operational railway. The ground surrounding the embankment was softened by moisture, and with no roads to the site, the area had to be accessed through an adjacent farm property.

    A single self-contained Mainmark Rig, with all equipment and material needed for project delivery, was positioned as close to the injection site as possible on the bank of the river. This allowed the crew to run the resin delivery hoses along the ditch in the railway deck during specified “safe times”, to deliver the Teretek resin to the affected areas.

    Teretek increases ground bearing capacity, fills voids, and has no detrimental effects on the environment.

    Following injection, the engineered resin immediately expanded to fill the space, binding with the aggregate to create a consolidated mass which filled each void and prevented further scouring under the bridge piers.

    Although two days were allowed for project delivery, Mainmark successfully completed works within a single day, and without causing any major disruption to the rail service.

    The bespoke methodology proved to be far quicker, more efficient and much less disruptive than the alternative options considered for remediating the bridge piers.

    Project Manager Tristan Burns stated that TasRail was satisfied with the project results, considering the unique nature of the project and the complexities involved:

    “The works were undertaken adjacent to an operating rail line and a sensitive site with environmental and local stakeholder constraints. VEC and Mainmark undertook the works in a safe and methodical manner.

    The repairs will ensure structural integrity of the piers in future floods which will preserve the heritage structure for many years to come.”

    Resources

    Project Resources & Downloads

    Teretek® Fills Underwater Voids To Stabilise Kimberley Rail Bridge Piers Following Floods
    Next Project

    Teretek® Delivers Ground Stabilisation Solution for Hard to Reach Foundations at Melbourne Hospital Campus

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram