Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile V16 N16JG013

    Rail Tunnel Safely Decommissioned

    Sub-industry
    Rail
    Problems
    Subsidence
    Location
    VIC
    Year
    2016
    Solutions
    Void Filling
    Technology
    Terefil®

    The problem

    An old rail tunnel under Mercer Street in Geelong, formerly a major transport line for the city, had fallen into disrepair. It had become a shelter for Geelong’s homeless community and was frequently vandalised.

    The 6-metre wide, 5-metre tall, 40-metre long tunnel needed to be safely decommissioned to enable construction of a public carpark along the rail corridor.

    Mainmark was appointed by Entracon Civil to abandon the tunnel. Using our lightweight Terefil® solution, we quickly and cost-effectively filled the 1,200m3 tunnel in just nine days.

    The solution

    The council required a fill material that would prevent access to the tunnel by vandals and drug users. The construction methodology had to ensure the safety of the homeless, who were using the tunnel as a shelter, was not compromised. The solution was also required to minimise disruption to the general public and street traffic above.

    The Result

    The original plan was to fill the void with polystyrene blocks over several weeks, however as polystyrene is highly flammable, the council was concerned a spark in the tunnel may cause a fire. The possibility of a fire was a significant risk to the project and to the members of the public who were using the tunnel as a shelter. The polystyrene system was also unable to bear heavy loads, making it less desirable for the project.

    Instead, Mainmark recommended its unique, engineered fill material, Terefil®, as an alternative approach.

    The lightweight formula can deliver strengths of between 500 and 6,000 kPA (at 28 days). Ideal for when granular fills or aggregate material options are too heavy, site access is limited, or project schedules are tight, Terefil® is easily-placed, and does not require pre-loading or compaction for settlement mitigation.

    The Mainmark team placed Terefil® at a rate of up to 60m3 per hour. The highly-flowable nature of Terefil® made it fast to apply, and the strong material was able to withstand heavy loads, plus the traffic along the road above was not impacted.

    By using Terefil®, Mainmark completed the project in just nine days instead of the several weeks it would have taken using the polystyrene method.

    Unlike other potential grout injection systems, which would require injection holes and breathers on the road above, Terefil® caused no disruption to traffic because it was pumped directly into the tunnel.

    Sean Durston-Ryan, Project Manager at Entracon Civil said, “This was the first time we had used Terefil® and the first time we had worked with Mainmark. The experience was very positive: Mainmark did excellent work and we were able to fill the void as required in a timely fashion. We would certainly choose to work with Mainmark again in the future as we achieved a very strong result for this project.”

    Resources

    Project Resources & Downloads

    Rail Tunnel Safely Decommissioned
    Terefil®
    Next Project

    Safety upgrade of a hazardous weir with Terefil®

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram