Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays). After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Consent
This field is for validation purposes and should be left unchanged.

W25GV2369

Keeping Adelaide Moving with Tramline Stabilisation

Sub-industry
Rail
Problems
Subsidence
Location
SA
Year
2025
Solutions
Ground Improvement
Technology
Teretek®

Problem

A nearby irrigation failure caused excessive water flow beneath the tramline at Victoria Square Station in Adelaide. This led to voids and a loss of support in the basalt fill beneath the track, causing early signs of instability, safety concerns, and potential service disruptions.

The tramline at Victoria Square Station in Adelaide faced a significant structural challenge due to an irrigation failure. Excessive water from the malfunctioning irrigation system seeped into the ground beneath the tracks, causing erosion of the supporting soils. This erosion resulted in the formation of voids that compromised the support beneath the concrete tramline. The instability was evident through early signs of track rocking and deflecting under load, which raised safety concerns and heightened the risk of potential service disruptions.

Solution

Taking advantage of a scheduled tramline shutdown, Mainmark was engaged to rectify the problem through the application of Teretek® resin injection technology.

This process involved injecting a resin-based geopolymer beneath the 30m² section of the compromised track. The innovative solution effectively filled voids, provided ground improvement and restored a solid support base beneath the concrete tramway. Teretek® rapid strength gain properties allowed for effective reinforcement with minimal disturbance to the existing infrastructure.

Result

Within just a few hours, Mainmark successfully eliminated the rocking and deflection of the track restoring support, and significantly reducing safety risks and restoring structural integrity.

The rapid delivery ensured minimal downtime with all works completed within a scheduled shutdown, enabling the tram service to recommence without any extra delays.

This successful project improved passenger safety and maintained the tram system’s operational reliability. It showcased how a fast, non- invasive approach can effectively address infrastructure issues while ensuring safety and preserving service quality.

 

Resources

Project Resources & Downloads

Keeping Adelaide Moving with Tramline Stabilisation
Need help?

Need help with a project? Contact us today.

Mainmark

© 2025 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Solutions

Ground Improvement

Subsidence Repair

Re-Levelling

Void Filling

Slab Lifting

Crack Wall Repair

Sinking Floors

Sinking Foundation Repair

Underpinning Repairs

Locations

Adelaide

Brisbane

Canberra

Hobart

Melbourne

New South Wales

Perth

Queensland

South Australia

Sydney

Tasmania

Townsville

Victoria

Western Australia

Sectors

Commercial

Residential

Infrastructure

Mining

Technologies

Teretek®

Terefil®

JOG

About Us

Our team

Careers

Media & Press

News

Awards

Contact

Locations
Mainmark Sydney

169 Sailors Bay Rd, Northbridge NSW 2063

 

Mainmark Melbourne

Unit 8, 33 Rosalie Street, Springvale VIC 3171

Mainmark South Australia

19 Heath St, Lonsdale SA 5160

Mainmark Queensland

20 Computer Road, Yatala QLD 4207

Mainmark Perth

115 Excellence Dr, Wangara WA 6065

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram