Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays). After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Consent
This field is for validation purposes and should be left unchanged.

Project Profile B1037

Harbour Seawall Rehabilitated

Sub-industry
Seawalls
Problems
Void Filling
Location
NSW
Year
2003
Solutions
Void Filling
Technology
Terefil®

The problem

In Kogarah Bay, Sydney, many years of tidal action had caused significant erosion behind the sandstone block seawall. Fines had been sucked out through the joints in the wall face, causing considerable voiding. Seepage of rainwater from the land had added to the erosion. Injections of Mainmark’s unique Benefil amino-plastic resin restored the integrity of the wall economically and quickly.

The solution

The objective was to solidify the ground behind the wall and fill the joints in the wall itself, to make good the voiding, re-support the wall from behind and help prevent future erosion. An integral part of this objective was to allow for the erosion-free escape of landwater

The Result

After testing to determine the degree of voiding of the subgrade behind the wall, injection pipes were installed in a grid pattern to varying depths across the whole area.

At each low tide, when all water had receded across the mudflats and all landwater drainage had ceased, the injection process was commenced.

Through the 40mm Ø pipes, Benefil amino-plastic resin was injected by hydraulic pressure. Injection was continued until the resin emerged from the joints right across the wall face.

This indicated that all voids, including crevices and cracks had been filled. Subsequent probing confirmed that no voids remained in the areas behind the wall.

Benefil resin was selected as the injection material for several important reasons:

1.Benefil aggressively penetrates all sizes of voids.
2. It can be pumped for very long distances without setting too quickly.
3. It is an extremely economical fill material for large volumes.
4. Benefilis permeable enough for land water to gently pass through the injected resin to escape into the waterway.

The full integrity of the Kogarah Bay seawall was restored quickly and economically, including provision for the drainage of land water.

Resources

Project Resources & Downloads

Harbour Seawall Rehabilitated
Terefil®
Next Project

Stabilisation Of Railway Level Crossing

Mainmark

© 2025 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Solutions

Ground Improvement

Subsidence Repair

Re-Levelling

Void Filling

Slab Lifting

Crack Wall Repair

Sinking Floors

Sinking Foundation Repair

Underpinning Repairs

Locations

Adelaide

Brisbane

Canberra

Hobart

Melbourne

New South Wales

Perth

Queensland

South Australia

Sydney

Tasmania

Townsville

Victoria

Western Australia

Sectors

Commercial

Residential

Infrastructure

Mining

Technologies

Teretek®

Terefil®

JOG

About Us

Our team

Careers

Media & Press

News

Awards

Contact

Locations
Mainmark Sydney

169 Sailors Bay Rd, Northbridge NSW 2063

 

Mainmark Melbourne

Unit 8, 33 Rosalie Street, Springvale VIC 3171

Mainmark South Australia

19 Heath St, Lonsdale SA 5160

Mainmark Queensland

20 Computer Road, Yatala QLD 4207

Mainmark Perth

115 Excellence Dr, Wangara WA 6065

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram