Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile W16GW001

    Embankment stabilisation using Permeation Grouting

    Sub-industry
    Bridge
    Problems
    Erosion
    Location
    WA
    Year
    2016
    Solutions
    Other
    Technology
    Permeation Grouting

    The problem

    As part of a rail upgrade project in Western Australia, to improve urban transport links, an unstable soil embankment needed to be consolidated to allow safe excavation within a railway corridor.

    The expansion works required the addition of two spur lines, the creation of an additional 3m of flat ground, drainage installation on either side of the existing rail line, and a new railway station immediately south of the cutting.

    The embankment soil was permeable and required stabilisation before excavation of the sandy soil could commence. The engineers’ design specified for the large area to be stabilised in an almost horizontal plane, instead of the usual vertical plane.

    As the rail line was to remain operational, the work had to be completed without causing any down-time. Due to safety constraints and hazards, the work could only be carried out during daylight hours, when temperatures were high as 54ºC.

    Mainmark stabilised the embankment using Permeation Grouting to a depth of 5m with ultrafine cement and installed Hollow Bar Soil Nails to provide slip plane control of the sandy embankment, followed by a shotcrete surface application. This provided a weathering surface and retained the grout-stabilised embankment.

    The solution delivered safe stabilisation of the embankment, with a design life of 100 years.

    The solution

    Mainmark needed to provide stabilisation for a steep slope embankment that could be excavated without the risk of subsidence, then provide a base for a protective layer of a solution that could remain in place for 100 years. The client required the slope to look like natural ground, necessitating a horizontal rather than a vertical approach.

    With the rail line servicing thousands of daily commuters, it was not possible to pause operations while the works were undertaken. The risk of highspeed trains interacting with the project materials or workers also needed to be considered and managed, with safety being paramount. Furthermore, overhead power lines were located close to the site, requiring works to be conducted in daylight hours for maximum visibility.

    Additionally, it was a requirement that Mainmark complete the works without affecting surrounding residents, ensuring noise levels and traffic interruption were kept to a minimum.

    The Result

    Mainmark treated the soil by inserting permeation tubes through 3.5m of overburden to an additional 2.5m of depth into the treatment area. As a result, it was necessary to perform a complete and continual levels and layout survey.

    Following treatment, the overburden would be removed and the embankment could be cut and shaped. Mainmark then installed 9m Hollow Bar Soil Nails in a grid pattern, installed drainage, covered it with mesh and then applied shotcrete to the area to a minimum 150mm thickness at 32 MPa.

    Mainmark used its Permeation Grouting solution because it is the most reliable and widely-used pressure grouting technique. It quickly fills cracks, joints and other small defects in sand, making it ideal to stabilise the embankment.

    The project caused no disruption to rail operations or surrounding residents. The railway saved millions of dollars by not having to shut down the line during the works. The result is a stabilised embankment that will remain safely in place for 100 years.

    Resources

    Project Resources & Downloads

    Embankment stabilisation using Permeation Grouting
    Permeation Grouting
    Next Project

    Collapsed Mine Shaft Stabilised with Terefil®, Bespoke Cementitious Grout and Innovative Placement Techniques

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram