Operating for 35 Years I 150+ Years of Experience I 84,000+ Jobs Completed I Iso Accredited I In-house Engineering

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

Hidden
This field is for validation purposes and should be left unchanged.

Project Profile N1070

Airliner Wash-down Area Re-supported

Sub-industry
Airports
Problems
Out-of-level Concrete
Location
NSW
Year
2001
Solutions
Slab Lifting
Technology
Uretek®

The problem

At Sydney international airport the sub-base under 400m2 of taxiway pavement slabs in the area used for washing-down 747s and other airliners had become water-eroded. The area was re-supported and re-levelled section by section by Uretek geopolymeric injections with no interference with airport activities. So successful and impressive was this project that we have been called in several times to do similar work at other areas of this airport and other major Australian airports.

The solution

To re-support and adjust the levels of the pavement slabs that were ‘pumping’ in the wash-down area of the airline’s jet-base. It was imperative that this be done economically and with no mess or inconvenience to airline operations.

The Result

Constantly saturated, the wash bay slabs had been undermined and lost support due to the sub-base losing fines with the hydraulic pumping action of the aircraft moving onto the area.

Where jacks had been used under the planes some slabs had even cracked so badly that they had been removed for replacement as shown in the photographs.

The technology applied was our patented method, Uretek Slab-Lifting, with expanding structural resins being injected below these very thick slabs to fill any voids, compact the sub-base and raise the slabs back to their precise design levels. Despite frequent rainstorms, the project was completed in just two full days.

The work was completed on time and on budget, despite frequent rain periods and caused no disruption to airport operations.

Successful completion of this project was instrumental in securing us other very similar projects at this airport (in 2002 and 2005) and at the principal airports of Brisbane (2001), Adelaide (2002) and Perth (2007)

Resources

Project Resources & Downloads

Airliner Wash-down Area Re-supported
Next Project

Sandstone Rail Tunnel Remediated

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Residential

Commercial

Infrastructure

Mining

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram