Operating for 35 Years I 150+ Years of Experience I 84,000+ Jobs Completed I Iso Accredited I In-house Engineers

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the issues you are experiencing. A Mainmark expert will contact you within the next 24 to 48 hours, excluding weekends and public holidays.

Hidden
Consent
This field is for validation purposes and should be left unchanged.

Project Profile N6079

Sandstone Rail Tunnel Remediated

Sub-industry
Rail
Problems
Subsidence
Location
NSW
Year
1997
Solutions
Re-levelling
Technology
Uretek®

The problem

The original tunnel had been carved out of Sydney sandstone in the 1930’s, and sandstone shavings were laid as a base in the tunnel above which a concrete track slab was laid, to which the rails had been attached. The tunnel was sloping downhill and the base of the tunnel was eroded, forming a drainage route over the half-century of use. The water running down had dissolved and washed away the fine sandstone aggregate. This caused the tracks to spring up and down as the trains travelled over the tracks, causing both safety concerns and reduced operating speeds. The asset managers drilled 1 cm holes to investigate the problem, and observed that water gushed up as the trains approached and travelled over the tracks.

The solution

The objective was to raise, re-level and re-support the rail tracks so that the trains could pass safely and quickly. This was to be achieved with minimal interruption to the passenger train service on this principal city circuit.

The Result

Our Operations Crew and Rig were transported into the tunnel on a high rail truck, and supplied with 3-phase power, as our diesel generator could not be used in the confined space. The team injected engineered structural resin, working over 2 nights when it was convenient to shut down the train service during the work. The rail line was lifted up to +5mm of the original level and the sub-base was significantly strengthened. The State Rail Authority was very satisfied with the results of the work and contracted more work on other rail projects with sandstone tunnels.

Resources

Project Resources & Downloads

Sandstone Rail Tunnel Remediated
Next Project

Bespoke Teretek® Application Stabilises Heritage Church Foundations

Mainmark

© 2025 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Solutions

Ground Improvement

Subsidence Repair

Re-Levelling

Void Filling

Slab Lifting

Crack Wall Repair

Sinking Floors

Sinking Foundation Repair

Underpinning Repairs

Locations

Adelaide

Brisbane

Canberra

Hobart

Melbourne

New South Wales

Perth

Queensland

South Australia

Sydney

Tasmania

Townsville

Victoria

Western Australia

Sectors

Commercial

Residential

Infrastructure

Mining

Technologies

Teretek®

Terefil®

JOG

About Us

Our team

Careers

Media & Press

News

Awards

Contact

Locations
Mainmark Sydney

169 Sailors Bay Rd, Northbridge New South Wales 2063

 

Mainmark Melbourne

Unit 8, 33 Rosalie Street, Springvale Victoria 3171

Mainmark South Australia

19 Heath St, Lonsdale SA 5160

Mainmark Queensland

20 Computer Road, Yatala QLD 4207

Mainmark Perth

115 Excellence Dr, Wangara WA 6065

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram