Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile N25BT025

    Addressing Subsidence through Ground Improvement and Re-Levelling at Tumbulgum Rangers Sports Club

    Sub-industry
    Public Buildings
    Problems
    Cracked Walls
    Location
    NSW
    Year
    2025
    Solutions
    Re-levelling
    Technology
    Teretek®

    Problem

    The Tumbulgum Rangers Sports Club, home to the local Rangers soccer club has been a cherished institution in the community for many years, serving as a hub for sporting activities and a gathering place for families and friends. However, the club faced significant issues due to substantial subsidence, most evident at the front corner of the building, where it had sunk by up to 175mm.

    This differential settlement led to a range of structural problems, including having a significant and noticeable fall from the centre of the building out to the building perimeter, so much so that the glass trophy cabinets doors on the second level were unable to stay closed.

    Solution

    Mainmark developed and executed a comprehensive injection strategy with two primary objectives: first, to lift the affected section of the building back towards level, and second, to fill any voids beneath the footings, improve any weak and compactable soils to maximise ground support and mitigate future subsidence.

    Teretek® was injected directly beneath the footing to a depth of 3.5m below the foundations. This multi-depth approach was beneficial in achieving the targeted level correction in a gentle and controlled manner, as well as treating the supporting soils at depth.

    The structure was closely monitored throughout the project, with injection rods strategically placed at optimum depths to minimise the risk of disruption to the surrounding paths and landscaping.

    Result

    As a result of Mainmark’s Teretek resin injection solution, the structure was successfully raised, which closed the cracks in the internal partition walls, restored an even floor grade, and ensured the trophy cabinets functioned properly, allowing them to open and close with ease. The additional multi-depth injections will further strengthen and support the soils, while the successful execution of the project highlights Mainmark’s commitment to providing quality engineering solutions and enhancing the facility’s safety and usability for the community.

    We exceeded the client’s expectations by delivering remarkable results that achieved a significant lift of the structure, enhancing its stability and functionality while ensuring their satisfaction with the project.

    Resources

    Project Resources & Downloads

    Addressing Subsidence through Ground Improvement and Re-Levelling at Tumbulgum Rangers Sports Club
    Teretek®
    Print At Home Crack Gauge
    Next Project

    Re-levelling a 20,000m² Warehouse 

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    Level 7/124 Walker Street, North Sydney NSW 2060

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram