Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Latest news

    Is this the reason machinery is malfunctioning?

    Machinery malfunction on a mining or construction site is often attributed to poor quality or shoddy equipment, when in fact the problem may be due to ground subsidence.

    The minor variances in ground level as a result of subsidence can cause machinery parts to misalign, placing unnecessary stress on the equipment.

    This can have a significant and costly impact on the smooth running of site operations. Sustained over time, it may cause equipment to break-down.

    The result is expensive repair and maintenance, decreased productivity and, in some cases, safety risks.

    The early warning signs

    Site operators are encouraged to check machinery for early warning signs of misalignment. These may include:

    • Unusual noise from the machinery
    • Abnormal wear and tear, particularly on conveyor belts due to additional impact
    • Excessive wear on machinery paths and bases, as a result of excessive vibrations that cause them to sink.

    The most common causes of subsidence (which refers to the gradual caving in or sinking of an area of land) include drainage issues, poorly compacted fill and mechanical vibrations which wear down the ground.

    Early intervention is key

    Addressing subsidence before machinery fails is always recommended, as this can minimise the costs of downtime. With modern ground engineering techniques, it can be easier and quicker to address subsidence than many anticipate.

    Resin injection technology, such as Mainmark’s Teretek engineered solution, is a proven, convenient, efficient and cost-effective alternative to traditional ground engineering techniques, such as underpinning. This method injects resin into fractured, broken or unstable soils and rock at high pressure, to consolidate and strengthen the ground.

    Fast-set resin injection can be applied in-situ with minimal interruption to site operations. Depending on the scope of work, a project may be completed in a matter of days and performed outside of programmed maintenance shutdown periods allowing for flexible scheduling.

    Mainmark also offers its innovative Terefil solution for the filling of large holes and voids. The world’s most advanced structural lightweight and cementitious-based filler, Terefil is a cost-effective and environmentally inert solution for addressing a variety of ground engineering challenges. Application examples include decommissioning fuel tanks, culverts, pipes and tunnels, as well as mass fill for large voids and abandoned mines.

    Learn more about Mainmark’s full range of polymeric and cementitious injection products for ground stabilisation and void filling in mines, including its proprietary Teretek resin and Terefil solutions.

    We also provide the following services in Australia:   wall crack repairs, sinking floor repairConcrete slab repairsinking foundation repairunderpinningground improvementre-levellingsubsidence repairvoid filling and slab lifting

    Laurie Andrews
    Laurie holds a Civil Engineering degree, an MBA, and 25 years of experience designing and delivering innovative solutions for residential, industrial, and commercial projects. As Regional Business Development Manager for NSW and ACT, he focuses on identifying opportunities, enhancing local capabilities, and delivering technical expertise to the market.
    Author's other posts
    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram