Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile Y20RV041

    Terefirm® Resin Injection Used to Increase Liquefaction Resistance at O’Connells Shopping Complex

    Sub-industry
    Public Buildings
    Problems
    Earthquake Damage
    Location
    NZ
    Year
    2020
    Solutions
    Ground Improvement
    Technology
    Terefirm®

    The problem

    O’Connells, a large retail, dining and office complex in Queenstown, New Zealand, was undergoing a multi-million dollar redevelopment to revitalise the entire site, including a new external façade and internal layout modifications. O’Connells was originally opened in 1988 as Queenstown’s first major shopping centre. The new development aims to blend luxury retail with contemporary dining experiences.

    As O’Connells is located in the heart of Queenstown and is an iconic local destination, the owners, Skyline Enterprises, felt it was important that the 4,000m2 building upgrade was earthquake resilient, particularly given Queenstown’s relative proximity to the Alpine Fault line.
    As part of the redevelopment, a NBS (New Building Standard) rating, a seismic standard indicator that rates a building’s ability to withstand an earthquake, was set to be in the upper quartile for both the structural and geotechnical works at the complex. Therefore, a solution that would improve earthquake resilience and liquefaction mitigation was an essential requirement for the O’Connells redevelopment to achieve the desired NBS rating.
    Engineers identified that the building required a new structural frame around the external perimeter and the foundations needed to be reinforced, in addition to creating a non-liquefiable crust beneath them that would mitigate the effects of excessive ground movement during an earthquake. As O’Connells consisted of 4-5 levels including a basement, undertaking the work presented significant challenges with very few feasible options available. Timing was also a crucial factor in the redevelopment. The building was closed during the works and the project needed to maintain a strict schedule in order to fit with peak trading windows.

    The solution

    Upon completion of the redevelopment, O’Connells needed to have an NBS score in the upper percentage quartile. This was achieved by strengthening the soil beneath the building across the entire treatment zone at a depth of 1-5 metres below the basement slab.

    The Result

    Mainmark’s Terefirm® Resin Injection solution was identified as the best approach for this complex project. It had already proven successful in previous liquefaction mitigation projects involving existing structures across New Zealand, including work on the Seaview Wastewater Treatment Plant in Wellington and Christchurch’s Northwood Supa Centa.

    As it was imperative for the O’Connells centre to be fully operational within 18 months, time-consuming excavation work and the use of heavy machinery was ruled out. Access issues created further complications as the building’s basement was just 2.1m in height in some areas, and there was only one vehicle entrance ramp which was blocked by scaffolding. The heave tolerance on the building also required careful planning and coordination, with the basement slab, walls, and columns requiring constant monitoring throughout the ground improvement process.

    To confirm the Terefirm® methodology for the site, Mainmark first conducted a 3-week ground improvement trial prior to undertaking the full scope of work. This included testing a 6m x 6m panel zone with 39 resin injection points to validate the design. Drilling small injection points at basement level, Mainmark was able to inject the expanding polyurethane resin into the soil, to a depth of 5m below the basement slab, with minimal impact on surrounding building activity and no negative effects on the existing structure. The client’s engineers therefore verified the likelihood of Terefirm® mitigating liquefaction in the event of an earthquake, allowing the building to reach the desired NBS percentage.

    Mainmark commenced the project in August and completed the work 5 months later with Terefirm® successfully densifying soft sections of ground within the treatment zone. The ground improvement work was completed under budget, achieving the soil strengthening levels required. This allowed Skyline Enterprises, the developers of O’Connells, to complete the redevelopment and re-open with a stronger foundation in time for Christmas.
    This successful project was the second largest Terefirm® treatment project to be completed by Mainmark, after the Seaview Wastewater Treatment Plant liquefaction mitigation project which was completed in 2019.

    Skyline Enterprises general manager of developments, Steve McLean, said all dealings with Mainmark were prompt and efficient.

    “Mainmark took the time to carefully explain the technical aspects of the project and provide information about past projects utilising the same approach. This was key to us then trialling their Terefirm resin injection solution. After the trial’s success, it was an easy decision for us to proceed with their product as we had proof that it would achieve the result we wanted.”

    “We were impressed with Mainmark’s professionalism and accuracy and thanks to Terefirm we were able to achieve our goals for this project in terms of performance, cost and timing.”

    Resources

    Project Resources & Downloads

    Terefirm® Resin Injection Used To Increase Liquefaction Resistance At O’Connells Shopping Complex
    Next Project

    Teretek® Re-levels Clifftop Home Impacted by Differential Ground Settlement

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram