Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile W17D058

    JOG and Teretek® Used to Raise and Re-Level Floor in Aged Care Facility

    Sub-industry
    Public Buildings
    Problems
    Subsidence
    Location
    WA
    Year
    2017
    Solutions
    Ground Improvement
    Technology
    JOG, Teretek®

    The problem

    The affected section of the facility encompassed nine patient rooms, each with an ensuite bathroom. The sloping floor was identified as a trip hazard for the elderly residents of the facility as well as Amana Living’s employees.

    Amana Living provides aged care services across 21 sites in Western Australia including Perth, Australind, Kalgoorlie, and Albany. Its services include residential care centres, housing, home care services, respite care, transition care, and dementia services. The dementia wing of its Kalgoorlie facility had experienced subsidence, resulting in a sloped floor that needed to be corrected.

    The affected section of the facility encompassed nine patient rooms, each with an ensuite bathroom. The sloping floor was identified as a trip hazard for the elderly residents of the facility as well as Amana Living’s employees.

    Amana Living worked with Duncan Jack Consulting Engineers to determine a solution that would raise and re-level the floor as near as practical to level. A complete re-build was considered and rejected because it was expensive and would have been far too disruptive for the facility’s residents.

    Mainmark recommended its proprietary Teretek® engineered resin injection, in conjunction with JOG Computer-Controlled Grouting. Using this combination, Mainmark was able to bring the aged care facility’s floors back to level within 10 days, with minimal disruption to the residents, who were able to return to their rooms every night.

    The solution

    The floor of the Amana Living aged care facility needed to be re-levelled, requiring a lift of approximately 100mm across an area of 190 m2.

    Minimal impact on residents was also requested. Each working day, the patients vacated their rooms in the morning and returned at night. This meant plumbers had to ensure all wet services such as toilets, basins, and showers could be used safely each night.

    Additionally, the solution needed to address possible subsidence or soil movement under the floor slab to help prevent issues from re-occurring in the future. Finally, it was important that the lift process was managed carefully to ensure that lifting-induced flexural gradients across the slab remained compliant with relevant codes and guidelines.

    The Result

    Mainmark combined its JOG Computer-Controlled Grouting solution, which is an advanced and proven technology for re-levelling structures under precision computer control, and Teretek® engineered resin injection solution to bring the floors back to level.

    JOG cementitious grout was used around the perimeter footing to target the 100mm lift height, then Teretek® was used to fill the void under the slab.

    The JOG system delivered a proprietary mix of cementitious grout to targeted areas of the structure’s footings. This fast and efficient process required no excavation as the cementitious grout was delivered via 40mm holes cored into the floor. A proprietary high pressure, low volume grout pump controlled by computer program circulates the cementitious grout to multiple injection points. The process was carried out as one continuous operation, circulating the grout to each point in the required quantity, raising the structure evenly and gradually, without any undue stress.

    The Teretek® resin injection solution was then used to fill any resulting voids under the slab. Teretek® is unique in that it delivers both ground improvement and re-levelling with a fast, non-invasive process, backed by a 50-year product warranty.

    Due to some difficulty accessing the site, Mainmark negotiated access with a neighbouring business by creating an access point within the boundary fence. The inner and outer courtyards of the aged care facility were cordoned off to prevent patients from accessing the work area.

    To ensure residents could use their bathrooms, Mainmark organised plumbers to check them each day, with minor repairs or adjustments carried out as necessary. Because the patients were unable to be rehoused during the project, Mainmark ensured all drill outs in the floor slab were flushed off after each work shift and all hoses removed so that the patients could return to their rooms and bathrooms safely and easily.

    Mainmark levelled the entire area simultaneously, addressing the potential issue of lifting-induced flexural gradients falling outside the relevant codes and guidelines. This approach lifted the entire treatment area and achieved the desired result of bringing the sloping floor back to level. It also gave Amana Living confidence that the underlying soil stability issue had been addressed, making further subsidence and related damage unlikely.

    Nicole Gardiner, Centre Operations Manager, Residential Care, Amana Living, said, “The Mainmark team did a professional, well organised, and tidy job. The team members were courteous, polite, explained the application very well and provided regular updates throughout the process. I would have no hesitation in recommending them to any potential clients.”

    Resources

    Project Resources & Downloads

    JOG and Teretek® Used to Raise and Re-Level Floor in Aged Care Facility
    Teretek®
    JOG Computer Controlled Grouting
    Next Project

     Water Ingress in Building Basement Eliminated with Acrylic Gel

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    Level 7/124 Walker Street, North Sydney NSW 2060

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram