Sub-industry
Plant Room
Problems
Floor Re-design
Location
NSW
Year
2026
Solutions
Void Filling
Technology
Terefil®
A plant room within the Sydney Metro West tunnel at the Clyde Dive had been constructed across two floor levels. A subsequent design change required a single floor level, leaving the lower section to be filled before a new concrete topping slab could be installed. The client needed a fill solution that could be placed within the tunnel and achieve the compressive strength required to support the slab and plant equipment.
Problem
The plant room’s existing two-level arrangement no longer suited the revised design. The lower section required filling to a depth of approximately 1.4 m to form the base beneath a proposed 40 MPa concrete topping slab.
For the Gamuda and Laing O’Rourke Consortium delivering the Western Tunnelling Package, the fill needed to achieve a minimum compressive strength of 3 MPa to support the topping slab and plant machinery.
Placement also required a practical means of delivering the material from the roadway above into the underground plant room.
Solution
Mainmark developed a Terefil® lightweight cellular concrete solution with a mix designed to achieve the project’s minimum 3 MPa compressive strength requirement.
A series of tests was carried out over several months before the works to determine the most suitable mix design.
The Terefil® was pumped through hoses fed from the roadway above through an opening in the tunnel roof. This arrangement allowed the material to be delivered directly into the lower section of the plant room.
Placement was completed in two stages across two days. Approximately 80% of the total volume was installed on the first day, with the remaining 20% placed on the second day. Samples of the placed material were submitted for compressive strength testing to verify performance against the specified requirement.
Result
Mainmark installed 112 m³ of Terefil® over two days, completing the fill required to bring the lower section of the plant room up to the level needed for the revised floor arrangement.
Compressive strength testing confirmed that the Terefil® samples achieved the minimum 3 MPa requirement after 28 days. The completed fill provided the base required beneath the proposed concrete topping slab and plant equipment, preparing the plant room for the next stage of construction.
Resources
Project Case Study
Terefil® Lightweight CellularConcrete Supports Plant RoomRedesign at Sydney Metro West
Download file
Please fill out this form to access this file.
Need help?
Need help with a project? Contact us today.
Next Project
Targeted Ground ImprovementAddresses Settlement BeneathSix Silo Slabs