Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile S16U002

    Terefil® Used to Abandon Pipeline at Iron Mine

    Sub-industry
    Mining
    Problems
    Pipe Decommissioning
    Location
    SA
    Year
    2016
    Solutions
    Void Filling
    Technology
    Uretek®

    The problem

    The mine is a division of a top-tier company in Australia, which mines iron ore used as an ingredient in producing premium-quality, low-impurity steel.

    Drain pipes from the tailing dam at the mine were malfunctioning because the decant riser pipes had been blocked by the iron ore residues. Left untreated, the blockages may have worsened, putting the pipes at risk of collapsing and compromising safety and productivity on site.

    As there was no access to the decant risers to allow them to be remediated, the northern and southern pipes needed to be safely and permanently abandoned. The high-density polyethylene (HDPE) pipes measured 200mm in diameter. One was 230m long and the other 241m long.

    Mainmark decommissioned by pipes by filling them with 15m3 of Terefil® 5000, its proprietary lightweight, flowable cementitious grout. The solution reached a compressive strength of 5MPa at 28 days to help mitigate risk of collapse. The work was completed in just three days.

    The solution

    Mainmark was required to fill the pipes without exceeding 300kPa pressure on the pipes during a 12-hour continuous placement and then cap the pipes on completion.

    As the pipes could only be accessed through a single point, the project required a highly flowable fill material that would travel the length of the pipes to fill them completely.

    Work was required to be completed in a tight project timeframe of three days, with minimal disruption to mine site operations.

    The Result

    Mainmark specified Terefil® for the project because it can be easily pumped across long distances. This flowability was crucial to the project’s success, given only access was at one end of the pipes.

    To fill the pipes, Mainmark placed 25mm breather pipes along the full length of the damaged decant riser pipes. These breather pipes exited the HDPE pipes through an adaptor that was fixed to the pipe end for placing the grout.

    Terefil® was the ideal material for this project due, in part, to its extremely low shrinkage rate and the lack of bleed water during curing time. A high shrinkage rate and too much bleed water can lead to an inaccurate fill with gaps between the pipe and the fill material.

    Terefil® overcomes this challenge and delivers a strong, reliable and environmentally-inert pipe abandonment solution.

    The tailing dam drain pipes are now safely decommissioned, removing the risk from the site.

    Resources

    Project Resources & Downloads

    Terefil® Used to Abandon Pipeline at Iron Mine
    Next Project

    Mine tunnel repair using ENCAP6®

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram