Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB, Max. files: 5.

    Restoring Foundation Support Beneath a Busy Delivery Centre

    Sub-industry
    Problems
    Subsidence
    Location
    VIC
    Year
    2026
    Solutions
    Re-levelling
    Technology
    Teretek®

    A busy delivery centre in Sunbury, Victoria, had developed signs of foundation movement along its northern elevation, including cracking, separation between precast wall panels and localised settlement around the external footings. Investigation identified subsurface voiding and variable ground conditions beneath the affected foundations. The client required a targeted solution that could improve the supporting ground and re-support and re-level the structure where practical, while avoiding extensive excavation and minimising disruption to the facility.

    Problem

    The single-storey industrial facility is constructed using precast concrete wall panels supported by a concrete strip footing system. Movement had become evident along sections of the northern wall, with cracking, joint separation and changes in alignment visible across the affected area.

    A previous structural assessment had recorded differential movement of up to approximately 16 mm between some precast panels, together with cracking around door and window openings and separation of internal finishes.

    During Mainmark’s site investigation, localised foundation settlement was evident and several panels had separated from adjoining panels. Further investigation beneath the footing identified subsurface voids, loose supporting soils and variable ground conditions. Areas of external soil erosion and in-ground depressions were also visible along the wall base, contributing to reduced and inconsistent support beneath the foundations.

    Without intervention, continued movement had the potential to further affect panel alignment, joints and surrounding finishes. The client therefore sought a solution that addressed the underlying ground conditions rather than simply repairing the visible symptoms.

    Solution

    Mainmark developed a staged Teretek® resin injection program to fill subsurface voids, improve the bearing capacity of the supporting soils and progressively recover foundation levels.

    Treatment was undertaken from outside the building along approximately 36 lineal metres of the affected external wall, reducing the need for intrusive works within the facility. Before injection commenced, underground services were located and precision level monitoring was established to continuously track the building’s response during treatment.

    Teretek® was initially injected beneath the footing to create an under-sealing layer, fill voids and improve immediate foundation support. Treatment was then progressively extended deeper into the supporting ground to densify weaker soils and achieve further level recovery.

    Additional targeted injections were completed through critical sections of the treatment area to improve support at greater depth. Throughout the process, the precast panels were carefully monitored and propped where required, allowing the Mainmark team to control structural movement while progressively improving the ground beneath the footing. Injection depths extended to approximately 2 metres below ground level.

    Result

    The Teretek® injection treatment successfully filled subsurface voids and improved the supporting ground beneath the affected foundations, providing a more consistent bearing platform for the structure.

    Controlled re-levelling was achieved across the treatment area, with noticeable crack closure and a reduction in visible panel separation observed during the works. Ground improvement at multiple depths strengthened the soil profile and improved support beneath critical sections of the footing.

    Approximately 1,034 kg of Teretek® resin was injected, with the entire treatment program completed over two working days. The works were carried out without disrupting mail centre operations, with business deliveries continuing as normal throughout. Following injection, all probes were removed, drill holes were sealed and the surrounding treatment areas were reinstated and left in a clean, serviceable condition.

    The result provided the client with a targeted alternative to extensive excavation and foundation reconstruction, addressing the underlying loss of support while preserving the existing structure.

    Experiencing settlement at your commercial property? Contact Mainmark to discuss your project.

    Resources

    Project Case Study

    Restoring Foundation Support Beneath a Busy Delivery Centre
    Need help?

    Need help with a project? Contact us today.

    Next Project

    Terefil® Lightweight Cellular Concrete Supports Plant Room Redesign at Sydney Metro West

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram