Operating for 35 Years I 150+ Years of Experience I 84,000+ Jobs Completed I Iso Accredited I In-house Engineering

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

Hidden
This field is for validation purposes and should be left unchanged.

Project Profile N12C028

High School Raised and
Re-supported

Sub-industry
Public Buildings
Problems
Cracked Walls
Location
NSW
Year
2012
Solutions
Slab Lifting
Technology
Uretek®

The problem

Severe wall cracking had occurred

At the famous Yanco Agricultural High School building in Southern NSW the footings of the main meeting hall building had sunk into the ground due to drought causing shrinkage of reactive clay soil. Severe wall cracking had occurred. 12 swimming pool surround slabs had also sunk. The large Uretek Deep-Lifting project was completed in just one and a half days, with wall cracks closed and trip hazards eliminated.

The Solution

To raise and re-support the building and the slabs quickly and efficiently.

The Result

The Joss Facilities Management company, acting for The NSW Department of Public Works contacted us to inject expanding structural resins into the ground. Precise planning was required to meet the timing objective. The plan for the project was set out with the Wagga Wagga Engineer and the Joss Project Manager Uretek resins were injected through small diameter tubes. As the resins went into the ground, they expanded. The ground was compacted and voids were filled.

Continued injection and expansion of the resins, constantly monitored by laser levels, produced the power to lift and re-level the heavy structure. To ensure that the lifting rotated the walls back into place with absolute accuracy, the Joss team put Acro props against the top of the walls. Some of the wall cracking was 42 mm wide. But the crack closure was complete and the walls and the pool slabs were raised right back to where they had been originally. The potential trip hazards were eliminated and the whole process took only a day and a half! Such a short time to carry out this set of big tasks was remarkable and the interruption of the school’s activities was absolutely minimal. The Yanco High Principal was delighted.

Resources

Project Resources & Downloads

High School Raised and Re-supported
Next Project

Teretek® Stabilises Concrete Roadway at the City of Canada Bay

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering Pty Ltd
ABN: 51 606 182 503

ISO 9001
ISO 14001
ISO 45001

Residential

Commercial

Infrastructure

Mining

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn
Instagram