Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile Z13Y300

    Art Gallery Re-supported and Re-levelled

    Sub-industry
    Public Buildings
    Problems
    Earthquake Damage
    Location
    NZ
    Year
    2014
    Solutions
    Ground Improvement
    Technology
    JOG

    The problem

    The world-class, modern Christchurch Art Gallery was badly shaken by the earthquakes that hit New Zealand’s South Island in 2010 and 2011.

    As the foundation ground suffered quite severe liquefaction, the 33,000 tonne building lost ground support. The Art Gallery’s footings sank unevenly across the 6,500m2 footprint of the building. Subsidence was as great as 182mm in some places. Using two new, leading edge technologies, Mainmark re-supported the building and then completely re-levelled the structure. Although the gallery was closed to the public since the quakes, it was occupied by the gallery staff and artworks, during the whole project.

    The solution

    Firstly to strengthen the entire foundation ground so that re-levelling could be done on the firmest of foundations. Secondly to precisely re-level the whole occupied building. Thirdly to ensure that all building services and ground anchor systems were maintained.

    The Result

    The 2-stage plan was to strengthen the foundation ground by Jet Grouting and then to re-level the structure by JOG, integrated computer grouting.

    Neither of these technologies had been used in New Zealand prior to Mainmark introducing them in response to the 2010-11 earthquake remediation.

    This massive project required some preliminary tasks: One was to measure just where the foundation ground required strengthening and by precisely how much. The Mainmark team, working with the Council’s engineers and Aurecon engineers, employed Trimble billionpoint plotting of positions and levels. Comprehensive 3D computer models of the building were produced, showing every miniature part of the structure and its position laterally and vertically. The 3D models indicated the areas of delapidation and provided benchmark data for monitoring progress. The Mainmark team also set up an automated robotic station-based wireless survey system to monitor levels, that enabled access to data from the many points across the entire building, in real time. Other preliminaries were de-watering and waterproofing due to the high water-table in the area, disconnection of 72 deep ground anchors and modification of building services.

    1. Jet Grouting

    Installation of 124 jet grout columns under the critical load points of the building to strengthen the foundation ground for better support of the entire structure. These columns are sometimes referred to as “soil-crete”, being a mix of in-situ soil and cementitious grout. The soil-crete columns were made to 3m and 4m Ø and to a depth of 6.5m. These columns were created through penetrations of just 200mm. Effectively a solid, deep-soil reaction matrix was created. There was minimal mess, as the excess slurry and water coming up from the ground was continuously evacuated via large hoses to transportation waste tanks outside.

    2. JOG integrated computer grouting

    Then the JOG method was used to re-level the settlement. For this, 350 ports were installed, via 40mm penetrations, for injection of cementitious grout to immediately beneath the huge concrete footings.

    Lifts of up to 182mm were required in some areas. The average amount of lift achieved was 2mm a day. The average amount of material injected was 34,000 litres. This peaked one day at 71,000 litres. In total the JOG work used nearly 1.5 million litres of injected material requiring over 16,000 x 25 kg bags of cement. The JOG work took 44 days and there were 22 men working on an average day. Then came the finishing tasks: The waterproofing and filling of all the jet grout and JOG penetrations of the basement slab, the re-instatement of all services and the re-connection of the 72 ground anchors. The foundation ground of the structure was strengthened and the design levels were restored to +/- 10mm in every location across the entire 6,500m2. A value-added consequence of the re-levelling works is that they will provide the building with improved behaviour under seismic loads by creating a stabilised crust down to 6.5m below the footings, reducing the amount of the predicted settlement induced by soil liquefaction. The Christchurch City Council and Art Gallery personnel were well pleased, and the rest of the restoration (structural and decorative) could proceed on a firm and level footing.

    Resources

    Project Resources & Downloads

    Art Gallery Re-supported and Re-levelled
    JOG Computer Controlled Grouting
    Next Project

    JOG and Teretek® Used to Raise and Re-Level Floor in Aged Care Facility

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram