Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Latest news

    Terefil® expedites civil and geotechnical project timelines

    Terefil® expedites civil and geotechnical project timelines

    Mainmark, is successfully expediting project schedules for void filling with its Terefil® solution, the world’s most advanced structural lightweight cementitious based filler for geotechnical applications.

    This innovative solution is a fast and cost-effective alternative to traditional methods, such as aggregate or granular fills.

    Unlike traditional cementitious flowable fills, Terefil® can be placed extremely quickly to shorten project timelines. The fast solution can also help to de-risk projects, as it requires less people and time on site, as well as fewer access points (which reduces the potential for grout spills).

    Reducing project time by 70 per cent in St Kilda

    Terefil® was specified by Comdain Infrastructure to safely and quickly decommission a 95-year-old, low-pressure gas pipe running beneath busy Acland Street in the Melbourne suburb of St Kilda. The 450mm, 390m long gas main needed to be relocated to facilitate improved tram stops along this busy road. The works were part of a broader program to revitalise the streetscape, led by the transport authorities and local council. The terminus sits on one of Melbourne’s busiest tram routes and near the entrance to the iconic Luna Park.

    The pipe needed to be decommissioned with minimum impact on the busy streetscape, completing the work as fast as possible to minimise traffic control costs, interruption to the tram network, and inconvenience to local residents and businesses. The steel gas pipe had lead joints, which were unlikely to withstand pumping pressures greater than 150kPa. The project team was required to work within these parameters. This eliminated the use of traditional sand filled grouts as they would be too slow to place and could only be pumped approximately 100m into the pipe, requiring multiple access points and much greater disruption to this busy shopping strip.

    Mainmark was appointed to fill the pipe with Terefil®, and ultimately reduced the project time from an estimated 11 days to just three days, with the Terefil®being placed in a single 12-hour shift.

    Filling a 620-metre water pipe in four days with no excavation

    Terefil® was also used to fill an in-ground water pipe in Beresfield, New South Wales, that was being abandoned ahead of constructing a new pipe. The abandonment works formed part of the Hunter Water infrastructure upgrade project, which will see the region’s oldest water tunnel being replaced and re-directed underground.

    Given the pipe’s location underneath a highway, school grounds and private land, digging it out was unfeasible and filling it using traditional means would create unacceptable disruption and require access to private property. The pipe’s construction and placement less than a metre underground meant there was a risk that it could rust and collapse, which would potentially damage the structures above it and incur high costs.

    A conventional fill method would involve digging up to seven holes to access the pipe, which would take approximately a week to complete. Instead, Mainmark completed the project in just four days with a single hole, using its unique Terefil® lightweight cementitious fill.

    One of the key features of Terefil® is its pumpability. Mainmark placed more than 400m3 of Terefil® along 620m of the 900mm diameter pipe in a single shift. At its peak, the Mainmark team pumped 68m3 of Terefil® per hour.

    As a result, the pipe was safely filled without damage or inconvenience to the school or any local property owners.

    Mainmark
    Since 1989, Mainmark has led the industry in re-levelling, ground improvement, and void-filling solutions. We deliver innovative and precise solutions with an extensive portfolio of completed projects worldwide. We’ve earned international recognition for iconic residential, commercial, infrastructure, and mining projects operating in Australia, New Zealand, Japan, and the UK.
    Author's other posts
    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram