Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Latest news

    Overcoming the challenges associated with decommissioning ageing pipe infrastructure

    In Australia, decommissioning and rehabilitating ageing infrastructure including gas, water and sewer pipes, is becoming an increasingly pressing issue for government and infrastructure stakeholders.

    As infrastructure ages, failure rates increase along with risks to the environment and public safety.

    When decommissioning or rehabilitating pipelines including culverts, a thorough ground and site assessment is critical to determine whether other significant underlying ground issues are present. Such issues can include underground voids which can lead to subsidence, soil destabilisation and water ingress that might lead to more serious ground collapses.

    Finding a cost-effective solution to address ageing pipe infrastructure, particularly when sensitive environmental considerations are at play, can be a major challenge for engineers. However, new and innovative technologies are now available to help address a number of common technical challenges such as the structural integrity of the pipe, pipe lining erosion, water or tree root ingress.

    Mainmark has introduced a number of technically advanced solutions that were successfully used to both remediate and decommission pipelines for a major water infrastructure project in NSW. Contractors were required to abandon an in-ground water pipe and construct a new main, however because the old pipeline ran underneath a highway, school and private land, digging the pipes out using traditional means was not feasible. The pipe’s construction and placement less than a metre underground meant there was a risk that it could rust and collapse, potentially damaging the structures above it.  The safest and most effective approach was to fill the pipe.

    Mainmark was able to provide a fast, cost effective solution using Terefil®, our proprietary lightweight cementitious grout solution that enabled the project to be completed in just four days.Terefil® is a unique solution, able to be pumped across long distances, making it ideal for large infrastructure projects where long pipes are involved.

    One of the key features of Terefil® is its pumpability. We placed more than 400m3 of Terefil® along 620 metres of the 900mm diameter pipe in a single shift. At its peak, the team pumped 68m3 of Terefil® per hour. As a result, the pipe was safely filled without damage or inconvenience to the school or any local property owners. A conventional approach would have involved digging up to seven holes to access the pipe, which would have taken at least a week to complete.

    Mainmark has also been instrumental in remediating pipe infrastructure assets using ENCAP6®, our technologically advanced anti-corrosion spray-on solution that revitalises and prolongs the life of ageing steel or concrete infrastructure.

    ENCAP6 is a low-cost polymer coating solution that can be used to rehabilitate and maintain assets because it has exceptional chemical resistance, hydrolytic stability and abrasion resistance. It also provides excellent, long term structural performance.

    It is easy to apply and it bonds tenaciously with prepared concrete, brick, earthenware, vitreous and metal surfaces to effectively seal and protect the substrate. It can be applied in varying thicknesses to deliver the required structural performance and is more stable than most other alternatives. Most importantly, it is environmentally inert and cost effective.

    Gladstone Council utilised ENCAP6 to remediate a galvanised steel drainage pipe that ran underneath three factories. The pipe was at risk of collapsing due to the surface weight of structures above. By coating the drain with ENCAP6, and supporting the pipe by applying expanding engineered resin beneath it, the council was able to avoid excavation, which delivered a significant cost saving.

    Nick St John
    Author's other posts
    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram