Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile N19LA007

    Bespoke Teretek® Application Stabilises Heritage Church Foundations

    Sub-industry
    Heritage
    Problems
    Subsidence
    Location
    NSW
    Year
    2018
    Solutions
    Re-levelling
    Technology
    Teretek®

    The problem

    When deep excavation works commenced as part of a major infrastructure project in Sydney, underground voids and subsidence were quickly identified at the site.

    Immediate action was required to enable continuation of the project works, while protecting the foundations of a heritage church situated adjacent to the excavation site. Originally constructed in the 19th century, the church is a treasured local icon, and preserving the historically important building was a priority of the project.

    Mainmark was contracted to stabilise the ground at the project site, including the church perimeter, to help prevent further subsidence and fill the voids that had formed, while protecting the structural integrity of the church.

    After receiving Dynamic Cone Penetration (DCP) test results from geotechnical engineers, and conducting a thorough evaluation of the site, Mainmark identified Teretek® engineered resin as the ideal solution for stabilising the sandy soil ground composition at the site.

    Due to the heritage status of the church, access to the historic building foundations was restricted to a 10m deep pit at the adjacent excavation site, which was surrounded by a 1m thick retaining wall.

    A unique application method was formulated which involved injecting the resin solution horizontally behind the retaining wall surrounding the excavated pit, in order to reach the difficult-to-access foundation ground beneath the church.

    Despite the complexity of the site and extensive wet weather conditions in the lead up to works, Mainmark was able to complete the project in just four days, two days earlier than originally planned.

    The solution

    Mainmark was required to improve the ground at the project site, compacting and densifying the sandy soil to stabilise the site for major excavation and construction works while helping to ensure the historic church was protected from further ground movement.

    Due to the church’s heritage status, the solution needed to be delivered from a nearby excavated pit. It was important for the solution to be delivered with minimal impact to the major infrastructure project works underway at the site.

    The Result

    Before commencing this complex project, geotechnical engineers undertook a series of DCP tests to analyse the soil integrity, and confirm the required solution to improve and stabilise the ground beneath the church foundations.

    Mainmark recommended their proprietary Teretek® engineered resin injection solution to stabilise the sandy soil at the site. Teretek® is a non-invasive and cost-effective method for ground improvement and filling voids. It is suitable for most soil types, and quick to apply.

    While Teretek® is usually applied vertically into the ground along the perimeter of an affected structure, it wasn’t possible in this instance because of the restricted access to the foundations of the church due both to its heritage status not allowing access from within the church, and due to the proximity of the church on the edge of the deep pit excavation. Therefore, the only access point was via the 10m deep pit located beside the church, which was surrounded by a 1m thick retaining wall.

    To overcome site access challenges, an elevated work platform was used within the pit to enable Mainmark technicians to apply the Teretek® via four horizontal injections behind the surrounding retaining wall. Each injection reached a depth of approx. 4m to strengthen the foundation ground directly beneath the church footings.

    Once injected into the sandy soil, the engineered resin immediately expands into the voids, compacting the loose soil and adding volume. When applied, the Teretek® immediately increased the ground density and bearing capacity of the soil at the site, which was confirmed with additional DCP testing following application.

    Despite wet weather causing extremely muddy conditions, and the horizontal application method which extended the time required to inject the solution, works were successfully completed within a shorter than anticipated timeframe of just 4 days. The Mainmark team worked seamlessly alongside the infrastructure project team, delivering the solution without impacting construction or delaying overall project timelines in any way.

    Resources

    Project Resources & Downloads

    Bespoke Teretek® Application Stabilises Heritage Church Foundations
    Teretek®
    Next Project

    Heritage Building Re-levelled

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    Level 7/124 Walker Street, North Sydney NSW 2060

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram