Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile N5571

    Rail Bridge Strengthened and Re-Supported

    Sub-industry
    Rail
    Problems
    Subsidence
    Location
    NSW
    Year
    2005
    Solutions
    Re-levelling
    Technology
    Uretek®

    The problem

    The two Bredalbane Rail Bridges each support two rail lines: for Northbound and Southbound trains running along Australia’s Main South Railway Line linking capital cities. The bridge piers were deflecting some 300mm on each pass of a train. The footings had cracked and the piers had begun to shear.

    The solution

    The objective was to re-level the rail lines and resupport the bridge pier quickly and efficiently so that both goods trains and passenger trains could use the rail line, without causing disruption to important transport infrastructure.

    The Result

    Uretek’s Deep-Injection method was used to resupport the pier footings and consolidate the ground. Then Uretek Slab-Lifting raised them (and the rail) up 40mm, back up to the original levels. The images show a stationary 129-tonne-locomotive acting as a superimposed load to provide overburden resistance and enable maximum compaction of the sub-grade whilst the crew were supporting, strengthening and raising the rail bridge. When the work was completed, the brick piers were strengthened with steel bands and the cracks were epoxy-grouted.

    Movement after treatment was reduced to less than 1mm. Trains were able to use the line within hours of the work being completed. Consequently the Australian Rail Track Corporation has asked us to work on other similar rail track repair projects.

    Resources

    Project Resources & Downloads

    Rail Bridge Strengthened and Re-Supported
    Teretek®
    Next Project

    Railway Bridge Re-levelled and Re-supported

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    Level 7/124 Walker Street, North Sydney NSW 2060

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram