Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB, Max. files: 5.

    90-Tonne Silo Re-Levelled Following Differential Settlement

    Sub-industry
    Manufacturing
    Problems
    Erosion of Supporting Soils
    Location
    VIC
    Year
    2026
    Solutions
    Re-levelling
    Technology
    Teretek®

    A 90-tonne stainless steel silo at an industrial processing facility had developed a pronounced lean after differential settlement occurred beneath its circular ring plinth foundation. Investigations identified soft ground, subsurface voiding and groundwater migration beneath the bunded concrete slab, with the lowest surveyed point recorded 36 mm below the reference level. The client required a solution that could restore the silo’s alignment, improve foundation support and address the underlying voids without dismantling the large structure or undertaking extensive excavation.

    Problem

    A 90-tonne stainless steel silo supported on a circular concrete ring plinth had developed a visible lean due to differential settlement beneath one side of the foundation. Surveying recorded the lowest perimeter point at approximately 36 mm below the reference level.

    Investigations identified soft ground, subsurface voids and groundwater migration beneath the bunded concrete slab and silo base. The treatment area was further complicated by structural beams, deeper foundation elements, process pipework, pump equipment and live electrical services located close to the foundation.

    The client required a controlled solution that could straighten the silo, fill the underlying voids, improve ground bearing capacity and reduce the potential for further settlement without dismantling the structure or undertaking extensive excavation and foundation reconstruction.

    Solution

    Mainmark implemented a staged Teretek® injection program to fill subsurface voids, improve ground bearing capacity and progressively re-level the silo.

    Small-diameter injection holes were drilled through the concrete slab around the circular ring plinth, with injection rods installed at depths ranging from approximately 1.5 metres to 3.5 metres. Treatment commenced at the lowest surveyed points and progressed through deeper and perimeter injection stages to improve support beneath and around the foundation.

    Approximately 836 kilograms of Teretek® material was injected in controlled volumes. As the resin expanded, it filled voids, densified weaker ground and generated the lift required to correct the silo’s alignment.

    Movement was continuously monitored using rotating laser and survey equipment. Injection rates and volumes were adjusted in real time to maintain a controlled lift and avoid overcorrection. CCTV monitoring was also used to protect nearby live services

    Result

    Mainmark successfully re-levelled the 90-tonne silo and corrected its pronounced lean to within the accepted project tolerance.

    At the lowest monitoring point, a total lift of 38 mm was achieved. The staged injection process restored the silo’s alignment while maintaining control over the structure’s movement throughout the works.

    The treatment also filled subsurface voids, improved the bearing capacity of the supporting soils and provided additional support beneath and around the circular ring plinth foundation.

    No structural distress was observed during or after treatment. The silo base and surrounding concrete slab remained intact and fit for continued operation.

    The project was completed over three days, avoiding the need for extensive excavation, dismantling of the silo or major foundation reconstruction.

    Resources

    Project Case Study

    90-Tonne Silo Re-Levelled Following Differential Settlement
    Need help?

    Need help with a project? Contact us today.

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    Level 7/124 Walker Street, North Sydney NSW 2060

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram