Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB, Max. files: 5.

    Restoring Ground Support at a Major Food Manufacturing Facility

    Sub-industry
    Factories & Warehouses
    Problems
    Subsidence
    Location
    VIC
    Year
    2026
    Solutions
    Void Filling
    Technology
    Teretek®

    A leading Australian manufacturer operates a major production facility in Victoria. The facility had experienced ongoing slab settlement within an oven production area, resulting in uneven floor levels, localised floor deformation, minor cracking and concerns regarding the support beneath the slab.
    The client required a specialist ground engineering solution that could address the underlying voiding and weakened ground conditions while improving floor levels and maintaining the functional drainage falls incorporated into the floor system. Due to the operational importance of the facility, the works needed to be completed within a tightly controlled shutdown window.

    Problem

    The facility relies on continuous, high-volume food production, making the performance and stability of the production floor critical to daily operations.

    The oven production area had experienced significant differential settlement across the concrete slab. A pre-works survey identified level variations of up to approximately 100mm throughout the most affected sections, with a noticeable low point through the centre of the area.

    The settlement had resulted in visible floor deformation, minor cracking and operational impacts within the production space.

    Existing drainage infrastructure and multiple underground services added further complexity. Sewer, water, stormwater and power services were located within and around the treatment area, requiring careful planning and monitoring before and during drilling and injection.

    Given the operational importance of the facility, the works needed to be completed within a limited shutdown window. The solution needed to improve ground support, reduce slab movement and recover floor levels where achievable, while maintaining the existing drainage falls designed into the floor system.

    Solution

    Mainmark developed a staged resin injection approach to address the subsurface voiding, improve ground conditions and progressively recover slab levels within the affected production area.

    Before drilling commenced, the client arranged for underground services to be located using CCTV inspections and ground-penetrating radar scanning. Sewer, water, stormwater and power services were identified within and adjacent to the work area.

    Injection points were installed across the treatment area in a grid pattern at approximately 1200mm, with known services carefully avoided during drilling. The concrete slab was found to be approximately 180mm thick.

    Mainmark used Teretek® resin injection to complete the ground improvement and controlled re-levelling works.

    The treatment was delivered across four stages:

    The first stage involved installing injection rods to approximately 1.5m depth to create an undersealing layer beneath the slab and address shallow voiding. Extensive voiding and saturated ground conditions were encountered during this stage, requiring greater resin volumes than originally anticipated to achieve refusal and produce a measurable slab response.

    The second stage involved intermediate ground improvement at approximately 2.0m depth. This stage focused on additional void filling and the consolidation of weakened subgrade materials beneath the slab.

    The third stage involved controlled level recovery at approximately 2.5m depth, with targeted injections completed throughout the most affected settlement zones. Floor levels were continuously monitored using laser and water level systems, with injections carried out incrementally so the slab response could be carefully controlled.

    The final stage involved deep consolidation at approximately 3.0m depth. This created an additional treatment layer beneath the slab and further improved support conditions within the most affected areas.

    Throughout the lifting process, the on-site engineering representative monitored and adjusted the production equipment to accommodate the changing slab levels.

    Result

    Mainmark successfully completed the void filling, ground improvement and controlled slab level recovery works beneath the oven production area.

    The completed treatment filled significant subsurface voids, improved support conditions beneath the slab, densified weakened subgrade materials and reduced differential settlement across the treatment zone.

    The works successfully re-levelled the slab by up to 98mm in the most affected areas. The post-treatment survey showed a substantially more uniform floor profile compared with the pre-treatment condition, while maintaining the functional drainage falls required within the production area. The previous low point through the centre of the oven area was significantly reduced, and floor levels became more consistent across the treatment zone.

    CCTV inspections were completed before and after the injection works. The final inspection confirmed that the monitored drainage lines had not been damaged during the treatment. The work area was cleaned upon completion, and a final level survey was undertaken to verify the achieved outcome. The project demonstrated Mainmark’s ability to deliver specialist ground engineering works within a complex operational industrial environment. By completing the works during a long weekend shutdown, Mainmark helped the client address slab movement and loss of support beneath a critical production area without the disruption and downtime associated with slab replacement.

     

    Resources

    Project Case Study

    Restoring Ground Support at a Major Food Manufacturing Facility
    Need help?

    Need help with a project? Contact us today.

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    Level 7/124 Walker Street, North Sydney NSW 2060

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram