Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile N23BT055

    Slab Stabilisation in a Warehouse Factory

    Sub-industry
    Factories & Warehouses
    Problems
    Voiding Beneath Floor Slabs
    Location
    NSW
    Year
    2023
    Solutions
    Stitching
    Technology
    Teretek®

    Background

    Situated in NSW, a well-known Australian tea producer had been observing movement of its warehouse floor slabs under forklift and truck traffic loading.

    This floor instability posed difficulties in loading and unloading warehouse racking and compromised the stability of forklift operations. Concerned about safety and the uninterrupted flow of operations, the owner contacted Mainmark to seek a solution.

    Problem

    Upon inspection, the Mainmark team identifiedthe presence of voiding beneath the floor slabs and deflection of up to 10 mm under load. To rectify the situation, the voids needed to be filled, to restore support, eliminate the deflection, and prevent further deterioration of the floor slabs.

    Given the warehouse’s pivotal role in order fulfilment and customer service, maintaining operational continuity with minimal downtime was imperative.

    As the warehouse racking was fixed in place and the solution needed to be able to be delivered while the racking remained loaded and in use. Another critical requirement of the client was that best practice be employed around the creation and management of any dust or other contaminants as Hygiene was a crucial concern.

    Solution

    Using a technique known as “stitching”, the Mainmark technicians used a Teretek® material specifically designed for such applications. After drilling an injection array along the slab joints, Teretek® was injected to fill the voids under the edge of the slab, confirmed by the observation of a positive uplift of the slabs of 1 to 2 mm via laser monitoring equipment.

    The selected Teretek® material has characteristics and mechanical properties ideally suited to achieving a high degree of flow, the required compressive strength to support the floor loading, and to ensure a complete fill was achieved without excessive lift impacting on the floor slabs.

    Throughout the work, the team adhered to best practices for dust suppression to manage any dust generation during drilling, ensuring compliance with necessary food safety requirements.

    Result

    The Teretek® treatment was completed within a single day without interruption to the warehouse operations.

    The rapid-setting properties of Teretek® also made the floor immediately trafficable. By stabilising the warehouse floor, Mainmark ensured enhanced safety for loading and unloading activities, optimised warehouse racking performance, and improved overall operational efficiency.

    “We’re very happy with these guys. Their team responded quickly to our query and came down for a site inspection and advice session, which put our minds at ease. A big problem for us was an easy fix for them. Thank you.”

    Steven Pike

     

    Resources

    Project Resources & Downloads

    Warehouse Factory Slab Stabilisation
    Next Project

    Large Swimming Pool Re-levelled

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    Level 7/124 Walker Street, North Sydney NSW 2060

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram