Get a FREE Quote Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Get a FREE Quote

Submit your enquiry using the online form with a brief description of the issue. A Mainmark expert will be in touch within 24–48 hours (excluding weekends and public holidays).

After clicking Submit, you’ll receive an email with the next steps—please check your inbox and spam folder.

Hidden
Photos or reports of issues (optional)
Drop files here or
Max. file size: 16 MB.
    Consent
    This field is for validation purposes and should be left unchanged.

    Project Profile V18E039

    Underground Gas Main Decommissioned with Terefil®

    Sub-industry
    Utilities
    Problems
    Pipe Decommissioning
    Location
    ACT
    Year
    2018
    Solutions
    Void Filling
    Technology
    Teretek®

    The problem

    An abandoned low pressure cast-iron gas main, located underneath an extremely busy tram stop in the Melbourne suburb of Brunswick, needed to be safely decommissioned as part of a broader maintenance program, and to make way for the construction of a new super tram stop for Yarra Trams. Portions of the cast iron main are close to 100 years old.

    The 300mm gas main is located beneath one of Melbourne’s busiest tram lines and the intersection of two major roads, Royal Parade and Brunswick Road. The tram line connects the northern suburbs of Melbourne with the CBD, Queen Victoria Markets, University of Melbourne and Royal Melbourne Hospital.

    Due to its location beneath the road and tram line, once it was isolated from the broader gas network, it was not safe to be left in situ without risk of it collapsing and causing damage to the road, tram lines and tram stop. Excavation to remove the main was deemed unfeasible as it would have come at a high financial cost. In addition, it would cause major disruptions to the local community, including residents and businesses, and create unnecessary mess, noise and traffic diversions.

    Mainmark was appointed by Comdain Infrastructure to deliver a time-efficient and cost- effective solution to fill the redundant gas pipe that would avoid digging up the road and tramway, minimising disruption to local residents, businesses, commuters and traffic.

    Once Comdain crews had safely isolated the gas pipe and removed the residual gas, it was then prepared for Mainmark to fill the void in the abandoned pipe. Using Terefil®, an advanced light-weight polymer modified cementitious based fill, the project was completed quickly and efficiently overnight, allowing the intersection to continue functioning as usual the following morning.

    The solution

    The overall objective was to safely fill the abandoned cast-iron gas main with Terefil as quickly and efficiently as possible to minimise interruptions to the road and tram network at the major Melbourne intersection.

    To further avoid inconvenience to local residents and businesses, it was essential that the remediation solution was delivered with as few entry points as possible to reduce the need for substantial excavation works and ensure the pipe could be structurally filled for maximum safety.

    The Result

    Mainmark’s advanced engineered Terefil cementitious fill was used to fill a 300mm ‘T’ section of the gas main pipe. The ‘T’ shaped pipe had 2 major lengths; a 25m length section and a 100m length section.

    Terefil was ideal for the specific project conditions as it is highly flowable and can be delivered up to 30m³ per hour making it well-suited to the tight project schedule and access limitations. Once set, the cementitious fill grout continues to strengthen over time, providing a long lasting and durable solution without impacting the environment.

    Due to its pumpability and self-compacting properties, Terefil was able to fill the entire abandoned pipe leaving no unfilled spaces, air pockets or gaps. Unlike other fills and grouts, Terefil doesn’t release any water as it sets, ensuring zero bleed and minimal shrinkage along the crown of the pipe, and provides firm contact between the metarial and the pipe as it sets, preventing the formation of underground cavities or voids as the cast iron pipe erodes over time.

    A total of 10.2m³ of Terefil was required to completely fill the gas main pipe without any air pockets or gaps, with the cementitious fill placed at a density of 700kg/m³.

    The Mainmark team was required to work within a tight work zone, approximately 3m by 10m, with additional access for two concrete agitator trucks that delivered material to the site.

    Only three pits were required to access the in-ground pipe (one acting as an inflow point, the other two acting as a ‘breather’ to allow air to escape the pipe whilst it was filling from the inflow end), which helped reduce costs, time and disruption to the local community. The project was successfully completed within a single overnight shift.

    Resources

    Project Resources & Downloads

    Underground Gas Main Decommissioned with Terefil®
    Terefil®
    Print At Home Crack Gauge
    Next Project

    Teretek® Re-levels Heritage Café in Melbourne

    Mainmark

    © 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

    Mainmark Ground Engineering Pty Ltd
    ABN: 51 606 182 503

    ISO 9001
    ISO 14001
    ISO 45001

    Solutions

    Ground Improvement

    Subsidence Repair

    Re-Levelling

    Void Filling

    Slab Lifting

    Crack Wall Repair

    Sinking Floors

    Sinking Foundation Repair

    Underpinning Repairs

    Locations

    Adelaide

    Brisbane

    Canberra

    Hobart

    Melbourne

    New South Wales

    Perth

    Queensland

    South Australia

    Sydney

    Tasmania

    Townsville

    Victoria

    Western Australia

    Sectors

    Commercial

    Residential

    Infrastructure

    Mining

    Technologies

    Teretek®

    Terefil®

    JOG

    About Us

    Our team

    Careers

    Media & Press

    News

    Awards

    Contact

    Locations
    Mainmark Sydney

    169 Sailors Bay Rd, Northbridge NSW 2063

     

    Mainmark Melbourne

    Unit 8, 33 Rosalie Street, Springvale VIC 3171

    Mainmark South Australia

    19 Heath St, Lonsdale SA 5160

    Mainmark Queensland

    20 Computer Road, Yatala QLD 4207

    Mainmark Perth

    115 Excellence Dr, Wangara WA 6065

    Mainmark Tasmania

     4/11 McRorie Court Cambridge TAS 7170

    Privacy Policy

    Terms and Conditions

    Created by Codex

    YouTube
    Facebook
    LinkedIn
    Instagram