Resin injection technology chosen by council as best treatment for subsidence at Dulverton School in Kent

Sub-industry
Public Buildings
Problems
Subsidence
Location
England
Year
2023
Solutions
Ground Improvement
Technology
Teretek®

When the nursery building at Dulverton School in the London borough of Bexley in Kent, showed signs of subsidence, the council chose Mainmark’s Teretek® resin injection technology, rather than traditional underpinning, to treat the problem.

Constructed in the 1960s, the nursery building was showing signs of subsidence, with large cracks visible inside the classroom walls and ceiling as well as stepped cracks appearing in the brickwork outside. A geotechnical survey and other investigations were carried out. Part of these were trial pits that were dug out to expose and examine the foundations. It was determined that the subsidence was caused by the clay soil beneath the foundations shrinking during the high temperatures of the long dry summer of 2022. The situation was exacerbated by nearby trees drawing moisture from the ground.

The geotechnical consultants on the project proposed traditional underpinning as a solution, however, as this would have required extensive excavations as well as causing considerable and lengthy disruption to the school, Nicole Burnett, the project engineer from Bexley council, decided to explore alternative options.

After seeing the detailed information offered on resin injection technology on Mainmark’s website, Nicole contacted them to find out more. A detailed quote and methodology statement for the use of Teretek® resin injection technology to treat the subsidence that affected two walls of the school was sent to Nicole.

Having confirmed with both her structural engineer and building control manager that this was an accepted remedial solution for subsidence treatment, Nicole specified Teretek® as the solution for ground improvement at Dulverton School.

How does resin injection technology work as a treatment for subsidence in school buildings?

Resin injection technology works by delivering a polymer resin into the soil under, or near to, the foundations suffering from subsidence. For the treatment, 16mm holes are drilled into the ground to reach the soil beneath the foundation or if required, holes of the same diameter are drilled through the concrete slab within the building. In some cases, the small diameter boreholes are drilled both inside and outside of the building. The resin is pumped through injection tubes inserted at predetermined depths by highly skilled ground technicians using handheld equipment. For Dulverton school all the geopolymer was injected from outside the building under the full length of the north wall and part of the west wall.

Once the liquid was injected, it quickly expanded and filled any voids, cracks and fissures in the soil before rapidly setting to form a solid mass of geopolymer resin at required depths, compacting the soil as a result. Through careful control of the resin mix and volume injected, the load bearing capacity of the ground beneath the foundations was increased.

Laser monitoring on the outside of the nursery building at Dulverton and visual checks of the inside of the classrooms during the treatment were used to assess progress. Laser monitoring allowed Mainmark to be able to confirm that they had achieved the 1mm to 3mm lift required at the specific points in the treatment zone. Post completion this showed that the ground at depth below the foundations had been sufficiently improved.

Due to the rapid nature of the process and the ease of access to key points on site when using handheld equipment, the subsidence treatment using Teretek® took only two working days. This prompted Nicole to comment on her experience of using it at Dulverton: “It seems less intrusive and can be completed much quicker than traditional underpinning”

The treatment was scheduled and completed at the start of the summer holidays, leaving plenty of time for any remedial works to take place at the school with the reassurance that the subsidence issue had already been treated and was backed by Mainmark’s 20-year product warranty. Due to the non-intrusive nature of the subsidence treatment and the ability of the geopolymer resin to provide some lift, the remedial work was minimal. This contrasts with traditional underpinning where the excavation work and heavy machinery required can result in remediation work required both inside and outside the building being treated.

Why is resin injection more suited to Dulverton school and other educational establishments than traditional underpinning?

As is the case in all educational establishments, the priority for Dulverton school when faced with subsidence was to rectify the problem quickly and effectively, with minimal disruption to the education of the pupils under its care. At all times the safety of the staff and pupils is paramount, and the pressure is on to be able to keep the school open and carry out any work required outside of term-time.

When looking at the options for treating subsidence, traditional underpinning, with its requirement for equipment for ground excavations, spoil disposal and concreting or underpinning, is a time consuming and complicated process, with treatment times of around 3 weeks. It cannot match the minimal disruption and rapid treatment times on offer from resin injection technologies.

The Teretek® treatment at Dulverton took only 2 days to complete. The speed and flexibility of the technique means that it can be employed over weekends or during half-term breaks limiting disruption to schools.

Cost, of course, is also a concern, especially given the limited budgets on which schools are having to operate. Traditional underpinning, with all the equipment, disruption and time required to carry out the process is usually a more expensive option when compared to resin injection technology. This was the case at Dulverton school where Nicole commented: “We obtained quotes for underpinning, but this came in at a much higher cost and would have been much more intrusive for effectively the same result”

When looking at the condition of the educational sector as described in the NAO report it states that 38% of schools have now passed their estimated design life . The expectation is that these will eventually require either completely rebuilding or refurbishing. The latter is usually the more cost-effective choice however, refurbishing can add extra weight to existing foundations. This is where the ground strengthening ability of resin injection technology could be used to good effect to provide a stronger base beneath the foundations and mitigate against the risk of future subsidence.

How can I find out more about using Mainmark’s resin injection technology to treat subsidence in the school estate?

Using Mainmark’s Teretek resin injection technology proved itself to be a cost-effective solution for Bexley Council when looking to treat subsidence at Dulverton school. Nicole confirmed that it was the first time that she had specified this solution and, when asked if she would consider using Mainmark resin injection technology on school projects in the future, Nicole responded by saying: “Yes, definitely. The team were great and the before and after photos speak for themselves. The school was also very happy with their work”

If you have a school project suffering from the effects of subsidence and would like to discuss the benefits of using Teretek®, please contact us today. Our experienced team of ground technicians will be happy to help you find the best solution that fits your specific requirements whilst minimising disruption to the school’s educational program.

Next Project

Innovative Geopolymer Injection Solution for Erosion Control

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering (UK) Ltd.

CRN: 09372443

Ground Improvement

Underpinning

Re-levelling

Subsidence Repair

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn