JOG and LPDG used to Re-level a Commercial Building

Sub-industry
Factories & Warehouses
Problems
Slab Lifting
Location
England
Year
2016
Solutions
Re-levelling
Technology
JOG, Other

The problem

A sizeable section of a large commercial building had suffered differential settlement of up to 156mm.

Staff facilities and amenities areas, as well as offices above, suffered during this settlement with cracks opening and floors sloping severely. The building had been founded on compacted fill placed at the conclusion of open-cast coal mining.

The Objectives

The project comprised of two main parts: To re-level the large section which had subsided. Treat the ground down at depth by filling any potential voids to minimise the likelihood of further settlement.

The two tasks were to be completed as soon as possible, avoiding impact on the complex building and its occupants.

All the works had to be carried out while the production and operation remained active as business interruption was not an option.

The Solution

JOG Computer-Controlled Grouting (JOG) re-levelling system was first utilised to level correct the building. The precise computerised control of the system allowed complete level correction without disturbance to the surrounding areas.

JOG and LPDG used to Re-level a Commercial Building 1601UK During the second phase, Low Pressure Deep Grout (LPDG), was utilised to fill voids at depth without fracturing the cohesive soils of the compacted fill material.

Injection rods were inserted in sections at 112 locations down to 6m. Grouting took place at 1m intervals in a bottom up process. The grout was introduced at low designed pressures allowing voids to be filled without fracturing the soils or creating uplift.

The structure was re-levelled and voids filled successfully, returning the building to design levels while the building remained occupied.

Next Project

Teretek® Raises and Re-levels Concrete Slabs at Busy International Airport

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering (UK) Ltd.

CRN: 09372443

Ground Improvement

Underpinning

Re-levelling

Subsidence Repair

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

YouTube
Facebook
LinkedIn