Book in your FREE, no-obligation site inspection. Contact us today for peace of mind.

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

"*" indicates required fields

Hidden
This field is for validation purposes and should be left unchanged.

Project Profile Y18H069

Mainmark Overcomes Site Challenges with Innovative Raft Slab

Sub-industry
Strata Building
Problems
Ground Improvement
Location
NZ
Year
2018
Solutions
Ground Improvement
Technology
Terefil®

The problem

When Offset Developments, a residential building company began construction on a four-unit complex in Christchurch, it encountered a significant challenge when it came to laying the foundations.

After receiving a geotechnical report, the company was advised to place a raft under the foundation slab to protect the site from possible subsidence, soil liquefaction and other issues that may arise due to the weakness of the ground. The project was designed with a 2m deep gravel raft. However, as the water table was only 1.2m below the surface, the ground was too soft for gravel to be compacted.

Mainmark developed a unique solution using Terefil®, a proprietary, advanced, structural lightweight cementitious-based filler that is commonly used for void filling.

The solution

Mainmark was required to develop an alternative raft solution that could accommodate the shallow water table which was contributing to the site’s very soft ground conditions.
Additionally, the solution needed to deliver ground improvement and liquefaction mitigation benefits for the proposed residential complex.

The Result

Mainmark worked in consultation with KGA Geotechnical Group Ltd, specialists in geotechnical engineering, to design a 900mm deep Terefil raft to be placed underneath the foundation slab. As the top of the raft was 200mm below the ground, the total excavation depth was 1100mm.

Terefil creates a non-liquefiable cementitious layer with a uniform mat that provides structural support. It requires no compaction, causes minimal site disruption during application and is self-levelling, lightweight and extremely cost effective. This fast and easy to place solution also has no detrimental effects
on the environment.

The speed at which Mainmark was able to place the rafts, following excavation of the site, resulted in a considerably reduced project timeline. While traditional compacted gravel rafts would take a minimum of seven days each in favourable conditions, Mainmark
was able to place four Terefil rafts in just five days.

According to George Nicol, Director, Offset Developments, “This is the first time that Terefil has been used for raft slabs. Given the predicament we were in, we were very happy to trial this solution as the alternatives were extremely expensive.”
“As it turns out, we couldn’t have been happier with the outcome. Not only is it a fantastic result, but we’ve discovered a new solution to address a common problem when it comes to improving the weak swampy
soil that is prevalent in many areas of Christchurch.” “Mainmark was also a pleasure to deal with and we’ll definitely be using Mainmark again in the future.”

Next Project

Mainmark Delivers Seismic Strengthening Solution For Fully Operational Wastewater Treatment Plant

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering (NZ) Ltd

ISO 9001
ISO 14001
ISO 45001

Residential

Commercial

Solutions

Seismic

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

Facebook