Commercial Building Subsidence Remediated
Summary
A building in this commercial complex o ten units in Christchurch had suffered differential settlement of up to 178mm with the 2010-2011 earthquakes.
It was rectified using JOG Computer-Controlled Grouting to raise the building up precisely to the required level.
Objectives
The task was to raise one of the buildings in this complex evenly without compromising the structure in any way, and so correcting the settlement and re-levelling the building.
A particular consideration was the need to avoid moving the next door building that was less than a metre from the back of the affected building.
Solution
The JOG Computer-Controlled Grouting levelling system was used to level the tilted, differential settlement of the structure. The fine degree of control offered by JOG allowed the substantial lift of the building to not affect the adjacent property.
Robotic survey stations were established above the other building of the complex to pick up level data from the many survey prisms set up on the building being lifted.
74 JOG iniection ports were installed through the concrete foundations, where the high mobility grout was introduced. The maximum lift was 178mm and the average was 110mm.
The structure was re-levelled successfully, returning the building to design levels, while leaving the neighbouring property unaffected.
Resources
Download a pdf version of this project here
Commercial Building Subsidence Remediated
Download file
Please fill out this form to access this file.Next Project
JOG Computer-Controlled Grouting Re-levels Multi-Storey Apartment Building in Christchurch
© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.
Mainmark Ground Engineering (NZ) Ltd