Book in your FREE, no-obligation site inspection. Contact us today for peace of mind.

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

"*" indicates required fields

Hidden
This field is for validation purposes and should be left unchanged.

Project Profile Z13 Y403

Commercial Building Subsidence Remediated

Sub-industry
Office Building
Problems
Earthquake induced differential settlement
Location
Christchurch, NZ
Year
2014
Solutions
Ground Improvement
Technology
JOG Computer-Controlled Grouting

Commercial Building Subsidence Remediated

Summary

A building in this commercial complex o ten units in Christchurch had suffered differential settlement of up to 178mm with the 2010-2011 earthquakes.

It was rectified using JOG Computer-Controlled Grouting to raise the building up precisely to the required level.

Objectives

The task was to raise one of the buildings in this complex evenly without compromising the structure in any way, and so correcting the settlement and re-levelling the building.

A particular consideration was the need to avoid moving the next door building that was less than a metre from the back of the affected building.

Solution

The JOG Computer-Controlled Grouting levelling system was used to level the tilted, differential settlement of the structure. The fine degree of control offered by JOG allowed the substantial lift of the building to not affect the adjacent property.

Robotic survey stations were established above the other building of the complex to pick up level data from the many survey prisms set up on the building being lifted.

74 JOG iniection ports were installed through the concrete foundations, where the high mobility grout was introduced. The maximum lift was 178mm and the average was 110mm.

The structure was re-levelled successfully, returning the building to design levels, while leaving the neighbouring property unaffected.

Resources

Download a pdf version of this project here

Commercial Building Subsidence Remediated
Next Project

JOG Computer-Controlled Grouting Re-levels Multi-Storey Apartment Building in Christchurch

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering (NZ) Ltd

ISO 9001
ISO 14001
ISO 45001

Residential

Commercial

Solutions

Seismic

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

Facebook