Book in your FREE, no-obligation site inspection. Contact us today for peace of mind.

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

"*" indicates required fields

Hidden
This field is for validation purposes and should be left unchanged.

Project Profile Z13 Y022

3-Storey Home Unit Block Re-levelled

Sub-industry
Factories & Warehouses
Problems
Earthquake Remediation
Location
Christchurch, NZ
Year
2013
Solutions
Void Filling
Technology
JOG Computer-Controlled Grouting, Slab Lifting, Void Filling

3-Storey Home Unit Block Re-levelled

Summary

This three-storey home unit block in Auckland had subsided as much as 80mm in some sections. It appeared that a number of large trees on the corner of the site had contributed to the subsidence.

Mainmark re-supported and re-levelled the unit block and the adjacent paving with injection of expanding structural resins.

Objectives

The main objective was to raise and re-level the three-storey building without disturbing the residents. Secondary objectives were to strengthen the foundation ground and to re-level the pavement.

Solution

Working with a geotechnical report provided by a consultant to the Body Corporate, Mainmark applied Uretek Deep Injection and Uretek Deep Lifting with expanding structural resins to re-support and re-level the external wall footings. Ten external injection points were required.

Uretek Slab Lifting was used to re-level and re-support the slab flooring. This was carried out from 27 internal

injection points. The injection zones are shown on the site sketch.

The main objective was to raise and re-level the three-storey building without disturbing the residents. Secondary objectives were to strengthen the foundation ground and to re-level the pavement.

Resources

Download a pdf version of this project here

Apartment Building Subsidence Remediated
Next Project

School Building Foundations Strengthened

Mainmark

© 2024 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering (NZ) Ltd

ISO 9001
ISO 14001
ISO 45001

Residential

Commercial

Solutions

Seismic

About Mainmark

Our team

Careers

Contact

Technologies

Media & Press

News

Awards

Privacy Policy

Terms and Conditions

Created by Codex

Facebook